- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 348 10.29 Non‐Renewable Energy 10.29.1 Electricity The provision of electricity infrastructure is necessary to sustain economic growth. The electrical grid includes both transmission and distribution networks at various voltages. Given the traditional industrial peat extraction and power plants, there is a significant transmission network in the Midland region. A 220kv grid passes through the southern part of the County and 400kv lines pass through northern Offaly, to the south of Westmeath serving the main power plants. Eirgrid the national body responsible for the management of the electricity transmission network, have planned key investments, upgrading of the transmission network and new circuit build and reinforcement, to cater for continued demand in the towns of Athlone and Mullingar. The upgrading of the transmission network will facilitate power flows from both renewable and conventional sources to maximise the use of existing power corridors. The Government Policy Statement on the Strategic Importance of Transmission and Other Energy Infrastructure (July 2012) acknowledges the strategic and economic importance of investment in networks and energy infrastructure. The Government endorses the major investment underway in the high voltage electricity system under EirGrid's Grid 25 Programme. The Planning Authority recognises the need for development and renewal of energy networks, in order to meet both economic and social policy goals and where appropriate, will consider the impact of proposed developments on the electricity grid network. According to EirGrid’s grid development strategy, GRID25 the demand for electricity in the midland’s region is expected to increase by over 40% by 2025. Electricity Supply Board (ESB) Networks is the key provider of electricity infrastructure in Ireland and works closely with Eirgrid, which is responsible for the operation and the development of the transmission system. EirGrid’s grid development strategy, GRID25, is designed to ensure that the transmission network has the capacity to provide for growth in electricity demand between now and 2025 (although it is noted that this strategy is being updated and will be replaced by a new grid/transmission strategy plan). EirGrid and the ESB have a range of major electrical infrastructure projects planned for the coming years. More recent EirGrid projects undertaken in the County include a new 25km 110kv transmission line which ran from Mullingar to Killaskillen, Co. Meath which was essential to improve the security of electricity supply to the Mullingar region. Council will support EirGrid’s Implementation Plan 2017 – 2022 and Transmission Development Plan (TDP) 2016 and any subsequent plans prepared during the lifetime of the RSES that facilitate the timely delivery of major investment projects subject to appropriate environmental assessment and the outcome of the planning process. The Council will continue to support the infrastructural renewal and development of electricity and gas networks. A balanced progressive approach will be adopted to minimise the impact on the
- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 349 environment while providing for the County’s energy needs. The sustainable provision of energy networks is therefore encouraged provided that it can be demonstrated that: The development is required in order to facilitate the provision or retention of significant economic or social infrastructure. The route proposed has been identified with due consideration for social, economic, environmental and cultural impacts. Where impacts are inevitable mitigation features have been included. Where it can be shown the proposed development is consistent with international best practice. 10.29.2 Natural Gas The gas pipeline crosses the south of the County between a point immediately south of Athlone town at the western end and north of Kinnegad at the eastern end. The towns of Athlone and Mullingar are connected to the line and Moate and Kilbeggan are intended to be connected as part of Phase 2. Electricity/Gas Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.168 Support and promote the sustainable improvement and expansion of the electricity transmission and distribution network that supply the County, subject to landscape, residential, amenity and environmental considerations. CPO 10.169 Support the provision of electricity and gas transmission networks to Athlone and Mullingar to provide for the medium to long‐term future needs of these towns, subject to landscape, residential, amenity and environmental considerations. CPO 10.170 Support and promote the improvement and extension of gas infrastructure to serve the County. CPO 10.171 Co‐operate and liaise with statutory and other energy providers in relation to power generation, in order to ensure adequate power capacity for the existing and future needs of the County. CPO 10.172 Support the implementation of EirGrid’s Grid 25 Investment Programme, subject to landscape, residential, amenity and environmental considerations. CPO 10.173 Support and facilitate the development of enhanced electricity and gas supplies, which do not negatively impact on environmental quality, landscape, wildlife, habitats or residential amenity and which are critical to the economic development of the County.
- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 350 CPO 10.174 Support roll‐out of the Smart Grids and Smart Cities Action Plan enabling new connections, grid balancing, energy management and micro grid development. CPO 10.175 Support and facilitate the development of enhanced electricity and gas supplies, and associated networks, to serve the existing and future needs of the Region and facilitate new transmission infrastructure projects that might be brought forward in the lifetime of this Strategy including the delivery of the necessary integration of transmission network requirements to facilitate linkages of renewable energy proposals to the electricity and gas transmission grid in a sustainable and timely manner subject to appropriate environmental assessment and the planning process.
- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 351 10.30 Information Communications and Technology Westmeath County Council continue to support Information Communications and Technology and are currently preparing a Westmeath Digital Strategy to encourage and support communities and businesses to reap the full rewards of a digitally enabled society. The strategy itself will provide an overarching vision for the County by setting out strategic goals and objectives aimed at harnessing digital opportunities for County Westmeath. Information Communication and Technology investment is essential for furthering the social and economic development of County Westmeath. The provision of an efficient broadband service is critical in the development of a knowledge‐based economy. To this end, the need to build new infrastructure to provide increased capacity in order to raise the quality of coverage and to meet the demand for services is recognised. Major advancements in relation to digital infrastructure have taken place within the telecommunications sector over the last two decades and Westmeath is serviced by the most up to date digital exchange technology. The County is served with broadband fibre optic connectivity to the trunk and junction network of the country’s main switching centres. Located on the Western Digital Corridor, Westmeath can facilitate international e‐commerce businesses. Important also, is the availability of high‐speed broadband services suitable for multinational companies including local area networks (LAN) connected to a wide area network (WAN). The towns serviced by the Metropolitan Area Network (MAN) presents opportunities for the development of e‐working centres throughout the region in line with Smarter Travel Policy of reducing the number of journeys to work by car. The development of e‐working centres throughout the region will align employment and transport policies and support uptake of the MANs network. Mullingar and Athlone have fully operational, vendor‐independent, high‐speed fibre‐optic Metropolitan Area Networks (MANs). There are also a number of mobile voice and data service providers operating across the County including Vodafone, O2, Three and Meteor. Westmeath continues to benefit from the rollout of several Government led broadband schemes (including the National Broadband Scheme, Rural Broadband Scheme and Broadband for Schools), ensuring that broadband services are available in communities across the County. Broadband is central to the development of a knowledge‐based economy throughout Ireland. Broadband also helps to combat social exclusion. Areas without broadband will be less able to take advantage of internet‐ centred developments in education, banking, research, business, etc.
- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 352 10.30.1 Telecommunications An efficient telecommunications system is important in the development of the economy. The de‐ regulation of the industry has brought choice and competition but has given rise to duplication and overprovision of certain facilities. The Council will have regard to the guidelines issued by the Department of the Environment, Heritage and Local Government, ‘Planning Guidelines for Telecommunications Antennae and Support Structures’ (1996) and Circular Letter PL 07/12. The assessment of individual proposals will be governed by the guidelines and the controls scheduled in the Development Management section of this plan. ICT and Broadband Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.176 Support and facilitate delivery of the National Broadband Plan. CPO 10.177 Promote and facilitate the sustainable development of a high‐quality ICT network throughout the County in order to achieve balanced social and economic development, whilst protecting the amenities of urban and rural areas. CPO 10.178 Support the national objective to promote Ireland as a sustainable international destination for ICT infrastructures such as data centres and associated economic activities at appropriate locations. CPO 10.179 Support the delivery of high capacity Information Communications Technology Infrastructure, broadband connectivity and digital broadcasting, throughout the County, in order to ensure economic competitiveness for the enterprise and commercial sectors and in enabling more flexible work practices e.g. teleworking. CPO 10.180 Seek to provide public Wi‐Fi zones in public spaces where possible. CPO 10.181 Support the coordinated and focused development and extension of broadband infrastructure throughout the County. CPO 10.182 Co‐operate with the Department of Communications, Climate Action and Environment and public and private agencies where appropriate, in improving high quality broadband infrastructure throughout the County. CPO 10.183 Achieve a balance between facilitating the provision of telecommunications infrastructure in the interests of social and economic progress and sustaining residential amenity and environmental quality. CPO 10.184 Ensure that the location of telecommunications structures should minimise and /or mitigate any adverse impacts on communities, public rights of way and the built or natural environment.
- TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 353 CPO 10.185 Encourage co‐location of antennae on existing support structures and to require documentary evidence as to the non‐availability of this option in proposals for new structures. The shared use of existing structures will be required where the numbers of masts located in any single area is considered to have an excessive concentration. CPO 10.186 Facilitate the provision of telecommunications infrastructure throughout the County in accordance with the requirements of the “Telecommunications Antennae and Support Structures – Guidelines for Planning Authorities”.
No text on this page — it is probably a drawing, a map, a photograph or a scanned page. See it in the PDF.
- CLIMATE ACTION 11 Westmeath County Development Plan 2021-2027 354 Table of Contents 11.1 Aim ...................................................................................................................................... 355 11.2 Background ......................................................................................................................... 355 11.3 Legislative and Policy Context............................................................................................. 356 11.4 Climate Change ................................................................................................................... 367 11.5 Climate Action – Adapting to Climate Change .................................................................... 370 11.6 Spatial Planning and Transport ........................................................................................... 370 11.7 Flood Risk Management ..................................................................................................... 371 11.8 Green Infrastructure ........................................................................................................... 371 11.9 Clean Energy ....................................................................................................................... 371 11.10 Urban/Rural Regeneration.................................................................................................. 372
- CLIMATE ACTION 11 Westmeath County Development Plan 2021-2027 355 11.1 Aim To transition to a low carbon and climate resilient County, with an emphasis on reduction in energy demand and greenhouse gas emissions, through a combination of effective mitigation and adaptation responses to climate change. 11.2 Background Westmeath County Council acknowledges that Climate Change is one of the most important and urgent issues facing the County today and accordingly has dedicated a standalone chapter to this subject matter. It is further noted that whilst Climate Change is a global phenomenon, the Council must take a leading role at local level to guide individuals, communities and business interests to mitigate against and adapt to Climate Change and its impacts. Addressing the problem requires co-ordinated action at various levels in addition to behavioural changes, the Development Plan has an important role to play in this regard. The Plan sets out to: 1. Integrate climate implications to inform spatial choices. 2. Support and translate National targets/obligations. 3. Prescribe objectives to realise adaptation and mitigation actions. 4. Ensure further integration in planning related decision-making processes. The Plan promotes behavioural change by influencing development patterns and by promoting a modal shift to more sustainable modes of transport. In addition, measures are included to fully integrate climate change into all aspects of spatial planning both at plan and project levels. Because a response to climate change requires an inter-disciplinary approach, this chapter crossreferences other sections of the Plan which include detailed adaptation and mitigation measures. Table 11.3 summarises how climate considerations have been incorporated into and ultimately inform the Westmeath County Development Plan 2021-2027.
- CLIMATE ACTION 11 Westmeath County Development Plan 2021-2027 356 11.3 Legislative and Policy Context 11.3.1 Planning and Development Act 2000 (as amended) Section 10 (2)(n) of the Planning and Development Act 2000 (as amended) requires Development Plans to include various types of objectives, including those relating to climate mitigation and adaptation. It is a Statutory Requirement for local authorities to incorporate the promotion of sustainable settlement and transportation strategies in urban and rural areas. 11.3.2 International Legislative and Policy Context Ireland has committed to addressing climate change through its commitments with Climate Change International and EU legislation to limit global temperature rise, reduce GHG emissions, improve energy efficiency, and increase energy consumption from renewable sources. These include: • The Paris Agreement. • The UN Sustainable Development Goals. • The 2013 EU Strategy on Adaptation to Climate Change. • EU 2020 and 2030 climate and energy targets as well as longer term 2040 and 2050 milestones and targets. • The Global Covenant of Mayors for Climate and Energy. 11.3.3 National Policy Context for Climate Change The 2012 National Climate Change Adaptation Framework (NCCAF) was Ireland’s first step in developing a national policy on adaptation actions to combat the impacts of climate change. The National Policy Position on Climate Action and Low Carbon Development 2014 restated the policy position of the NCCAF, 2012. Greenhouse gas mitigation and adaption to the impacts of climate change were to be addressed in parallel national plans under an evolving climate policy to 2050. The Irish government has since published the Climate Action and Low Carbon Development Act 2015, the National Mitigation Plan 2017, the National Adaptation Framework 2018 and Project Ireland 2040 (the National Planning Framework and the National Development Plan) and the Climate Action Plan 2019. These set out how Ireland will achieve its international and European commitments, and transition Ireland to a low carbon society. To provide local authorities with support in developing their Climate Change Action Plans (CCAPs), the Department of Communications, Climate Action and Environment (DCCAE) has developed the Local Authority Adaptation Strategy Development Guidelines 2018. In addition, the government has established four Climate Action Regional Offices (CAROs), each led by a local authority.
Source Westmeath County Council: Westmeath County Development Plan 2021–2027 (2021–2027) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.