  1. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021-2027 338 Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.139 Support local, regional, national and international initiatives for limiting emissions of greenhouse gases through energy efficiency and the development of renewable energy sources which make use of the natural resources in an environmentally acceptable manner and having particular regard to the requirements of the Habitats Directive. CPO 10.140 Facilitate measures which seek to reduce emissions of greenhouse gases and support the implementation of actions identified in the Westmeath County Council Climate Change Adaptation Strategy 2019-2024 and any future amendments. CPO 10.141 Promote and support the use of renewable forms of energy as a contribution to the energy demand of all new buildings where it is consistent with the proper planning and sustainable development of an area.
  2. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021-2027 339 10.23 Wind Energy Ireland is one of the leading countries in its use of wind energy, the largest contributing resource of renewable energy in Ireland. It is both Ireland’s largest and cheapest renewable electricity resource and is the second greatest source of electricity generation after natural gas. In 2018, Wind provided 85% of Ireland’s renewable electricity and 30% of our total electricity demand. The Government White Paper entitled ‘Ireland’s Transition to a Low Carbon Energy Future, 2015-2030’ (Department of Communications, Energy and Natural Resources, December 2015) sets out that a 2020 national target of 40% renewables energy is likely to require a total of 3,500 - 4,000 megawatts of onshore renewables generation capacity. The Council recognises the importance of wind energy as a renewable energy source which can play a vital role in achieving national targets in relation to reductions in fossil fuel dependency and therefore greenhouse gas emissions and seeks to enable renewable and wind energy resources of County Westmeath to be harnessed in a manner that is consistent with proper planning and sustainable development of the area. There are a number of issues which must be taken into consideration when dealing with applications for wind energy development including; visual impact; landscape protection; impacts on residential amenity; impact on wildlife and habitats; connections to the national grid and impact of construction and ancillary infrastructure including access roads. The Council will have regard to the Wind Energy Development Guidelines for Planning Authorities, prepared by the Department of Environment, Heritage and Local Government, or any update made thereto. Further, regard should be taken of the Landscape Character Assessment of the County which is contained in the accompanying Volume 2 of this Plan. In addition, potential applicants are advised to consult with the Department of Arts, Heritage and the Gaeltacht, The Forestry Service, the Irish Aviation Authority, Failte Ireland and other appropriate statutory and non-statutory bodies in areas which may require special protection. In general, the Council will encourage wind energy, provided such developments would not have an adverse effect on residential amenities, tourism amenities, special landscape character, views or prospects, Natura 2000 sites, protected structures, aircraft flight paths or by reason of noise or visual impact. Applications for such developments will not be encouraged in Areas of High Amenity. 10.23.1 Micro-Renewable Energies and Small-Scale Wind Energy Development The Council encourages the development of small-scale wind energy development and single turbines in urban and rural areas, including residential areas, and industrial parks, provided that they do not negatively impact upon the environmental quality, landscape, wildlife and habitats or the residential amenity of the area. Community ownership of wind energy projects enables local communities to benefit directly from local wind energy resources being developed in their local areas, ensuring long-term income for rural communities. The Council will encourage communities to co-operate in the development of suitable wind energy projects, be they in rural or urban locations.
  3. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 340 10.23.2 Industrial Scale Wind Farms The Regional Economic and Spatial Strategy for the Eastern and Midland Region (RSES) refers specifically to the after use of peatlands and consideration of their potential contribution to climate change mitigation and adaptation including renewable energy production. With a strong history of energy production and an extensive electricity transmission network in place, the potential exists in such peatland areas for a smooth transition to renewable energy sources. This approach should be informed by the preparation of a Holistic Management Plan that will address the future uses of former industrial peatlands. The preferred locations for large scale energy production, in the form of windfarms, is onto cutover cutaway peatlands in the County, subject to nature conservation and habitat protection requirements being fully addressed. Wind Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.142 Have regard to the principles and planning guidance set out in Department of Housing, Planning and Local Government publications relating to ‘Wind Energy Development’ and the DCCAE Code of Practice for Wind Energy Development in Ireland and any other relevant guidance which may be issued in relation to sustainable energy provisions. CPO 10.143 Ensure the security of energy supply by supporting the potential of the wind energy resources of the County in a manner that is consistent with proper planning and sustainable development of the area. CPO 10.144 Encourage and support the development of small‐scale wind energy development and single turbines in urban and rural areas and Industrial Parks, provided they do not negatively impact upon environmental quality, landscape, wildlife and habitats or residential amenity. CPO 10.145 To strictly direct large‐scale energy production projects, in the form of wind farms, onto cutover cutaway peatlands in the County, subject to environmental, landscape, habitats and wildlife protection requirements being addressed. In the context of this policy, industrial scale/large‐scale energy production projects are defined as follows: Projects that meet or exceed any of the following criteria:  Height: over 100m to blade tip, or  Scale: More than five turbines, or  Output: Having a total output of greater than 5MW
  4. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 341 Developments sited on peatlands have the potential to increase overall carbon losses. Proposals for such development should demonstrate that the following has been considered: • Peatland stability; and • Carbon emissions balance. CPO 10.146 Ensure that proposals for energy development demonstrate that human health has been considered, including those relating to the topics of:  Noise (including consistency with the World Health Organisation’s 2018 Environmental Noise Guidelines for the European Region);  Shadow Flicker (for wind turbine developments, including detailed Shadow Flicker Study);  Ground Conditions/Geology (including landslide and slope stability risk assessment);  Air Quality; and Water Quality;  Assessment of impacts on collision risk species (bird and bats). CPO 10.147 With regard to wind energy developments, to ensure that the potential for visual disturbance should be mitigated by applying an appropriate setback distance, which, where relevant, complies with available Ministerial Guidelines. CPO 10.148 Support the preparation of a Management Plan for the Industrial Peatlands in the County, in consultation with stakeholders and adjacent Local Authorities. The Plan should focus on recreational opportunities, renewable energy, hydrological and ecological considerations subject to environmental assessment and the requirements of Article 6 of the Habitats Directive. 10.24 Solar Energy Solar energy is any type of energy generated by the sun. It is a renewable energy source which reduces demand for electricity supply from the national grid where energy is mainly sourced from finite fossil fuels. Solar can be a passive energy source i.e. sunlight heating up a room or an active energy source where sunlight is harvested and converted to electricity in solar cells. Solar technology is developing at a rapid pace and has minimal impact on the environment. The Council will continue to encourage solar energy in commercial and residential developments, subject to design and other environmental considerations.
  5. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 342 Solar Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.149 Support Ireland’s renewable energy commitments outlined in national policy by facilitating solar power where such development does not have a negative impact on the surrounding environment, landscape, historic buildings or local amenities. CPO 10.150 Encourage and support the development of solar energy infrastructure, including solar PV, solar thermal and seasonal storage facilities. CPO 10.151 Ensure that proposals for solar farms consider the following criteria:  The Landscape Character of the County.  Visual impact particularly on raised/elevated sites.  Zone of visual influence and visual impact of the structures.  Glint and glare report and potential impact on adjoining road networks and dwellings.  Road access and impact on road network serving the site during the construction phase (A pre and post construction impact report may be required).  Archaeological Impact.  Incorporation of security measures – use of CCTV/surveillance cameras and security fencing.  The suitability/strength of the grid and accessibility to it.  The suitability of the site, having regard to other land use policies, including the need to protect areas of important built and natural heritage.  Decommissioning of obsolete infrastructure and after‐use.
  6. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 343 10.25 Geothermal Geothermal energy refers to heat energy stored in the ground. Heat is supplied to the ground from two sources, namely the hot core of the planet and the sun. It can be classified as either ‘deep’ or ‘shallow’ depending on the depths from which it is sourced. The deep geothermal energy can only be accessed through geological processes or by drilling through the surface. The second source of heat in the ground is from radiation from the sun. This energy can be regarded as stored energy which stays relatively warm throughout the year. This heat can then be extracted by using a ground source heat pump. Geothermal Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.152 Support Ireland’s renewable energy commitments outlined in national policy by facilitating the exploitation of geothermal energy where such development does not have a negative impact on the surrounding environment, landscape, biodiversity or local amenities. CPO 10.153 Ensure that any proposal for geothermal technologies or any other subsurface exploration does not impact on groundwater quality.
  7. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 344 10.26 Bio‐Energy Bio‐energy is derived from bio‐fuels such as biodiesel, biogas and biomass through the use of a wide variety of technologies. These energy sources are considered to be “CO2 Neutral”, not adding to the carbon dioxide level in the atmosphere and are more reliable in terms of consistency in supply than many other renewable energy technologies. There are many bio energy fuel sources and technologies, and several conversion alternatives (i.e. indirect sources that can be converted into biofuel). All dry resources; wood and wood residues (forest or sawmill residues) and dry agricultural residues such as straw, has the potential to be combusted to produce heat, electricity or both, in suitable designed boilers. However, it must be noted that for typical commercial and industrial biomass burners as well as domestic units, a high specification biomass fuel must be used. Forest and wood residues require larger more robust boiler units – typically those used to generate electricity from peat. Energy crops, principally short rotation coppice, can also produce dry fuels for combustion. Wet resources can be processed through anaerobic digestion, producing a methane rich gas for combustion. Such resources include agricultural slurries, sewage sludge, food and catering wastes and the biodegradable fraction of municipal solid waste. An additional bio‐energy resource is landfill gas, which can be collected at landfill sites and then combusted to extract its energy value. Given the grassland and cattle dominance of Westmeath, there is considerable potential to exploit the energy potential from grass and slurry waste as a feedstock for technologies such as anaerobic digestion. The Council will encourage the production of bio‐crops and forestry for biomass in the generation of renewable energy as well as production units in appropriate locations. In addition to the “CO2 Neutral” status of this energy source, the Council recognises that this sector also offers opportunities for farm diversification and rural employment. The Council will seek to promote and facilitate the development of bioenergy technologies, subject to environmental, habitats and landscape protection. Bio‐Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.154 Support the development of an indigenous bioenergy sector, including the mobilisation of low value residual biomass for the production of renewable electricity.
  8. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 345 10.27 Hydro River hydro projects may play a part in the County’s renewable energy mix. The Council encourages the use of rivers, where suitable, within the County for the development of hydro energy and in particular, will be supportive of individual developments along the banks of rivers which propose hydro energy to provide an element of their energy requirements, subject to environmental considerations. The Council will not encourage the use of the canal system, which is designated for tourist and amenity use, for this purpose. Renewable Energy Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.155 Support and advance the provision of renewable energy resources and programmes in line with the Government’s National Renewable Energy Action Plan (NREAP), the Governments’ Energy White Paper “Irelands Transition to a Low Carbon Energy Future (2015‐2030) and any other relevant policy adopted during the lifetime of this plan. CPO 10.156 Work in partnership with local communities to develop energy efficient and renewable energy projects to benefit the local area subject to development management standards. CPO 10.157 Support the production of sustainable energy from renewable sources such as wind, solar, bio‐energy and the development of waste to energy/Combined Heat and Power Schemes at suitable locations and subject to compliance with the Habitats Directive. CPO 10.158 Promote the application and uptake of technologies and solutions that utilise grass for energy extraction such as anaerobic digestion, subject to proper planning and environmental considerations. CPO 10.159 Promote and prioritise utilisation of existing waste streams from agricultural and forestry sectors for renewable energy projects including anaerobic digestion, subject to proper planning and environmental considerations. CPO 10.160 Prepare a Renewable Energy Strategy for the County over the lifetime of this plan and subject to the availability of resources. This strategy will support the development of renewable energy infrastructure to deliver government objectives in relation to energy efficiency and the transition to a low carbon future. CPO 10.161 Support future projects and funding initiatives to support renewable energy usage in Westmeath.
  9. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 346 10.28 Sustainable Building and Design The Council will support and encourage the use of sustainable building principles and retrofitting existing buildings and other sustainability principles to improve energy performance. The introduction of the Building Energy Rating (BER) certification process, requires dwellings to be assessed on their energy performance, which will reduce energy demand in buildings and reduce CO₂ emissions. A key area for consideration in sustainable construction and building design specification is in the area of CO2 and energy with particular reference to embodied CO2 and embedded energy. The focus should be directed towards the use of green construction materials. Arising from the Recast of the European Performance of Buildings Directive 2010/30/EU, from 1st January 2019, every new public building must be designed to nearly zero energy building standards. Also, all other new buildings have to comply with the new nearly zero energy buildings standards from 1st January 2021. The Council will have regard to the DoEHLG publication Towards Nearly Zero Energy Buildings in Ireland Planning for 2020 and Beyond and the EU Energy Performance of Buildings Directive (2010/31/EU) which promote the increase in nearly Zero Energy Buildings (nZEB). The Council promotes the development of low carbon buildings. Energy efficiency and the renewable requirements for new buildings including new residential development are addressed in the Building Regulations Part L. The aim of Part L is to limit the use of fossil fuel energy and related CO2 emissions arising from the operation of the building. The introduction of the BER label, Building Energy Rating, allows for dwellings to be assessed on their energy performance. The provision of this label system allows individuals to make informed decisions regarding the energy efficiency of a building. There are exemptions for Protected Structures, proposed Protected Structures and buildings protected under National Monuments Legislation. Sustainable Building and Design Policy Objectives It is a policy objective of Westmeath County Council to: CPO 10.162 Support the implementation of National and County initiatives for limiting emissions of greenhouse gases by incorporating energy efficiency measures into the design of new buildings. CPO 10.163 Inform and encourage new developments to mitigate against, and adapt to, where possible the impacts of climate change through the location, layout and design of the development. CPO 10.164 Encourage low‐energy design through measures including information provision (in conjunction with other Directorates) and through the development of Westmeath specific standards/guidelines in respect of spatial requirements within the remit of planning (e.g. solar orientation) especially during planning process including pre‐ planning consultations.
  10. TRANSPORT, INFRASTRUCTURE AND ENERGY 10 Westmeath County Development Plan 2021‐2027 347 CPO 10.165 Encourage improved energy efficiency of existing building stock and to promote energy efficiency and conservation in the design and development of all new buildings, including Local Authority dwellings. CPO 10.166 Develop guidelines and standards to assist property owners in respect of energy retrofitting and planning considerations. CPO 10.167 Support and promote the development and use of passive solar design principles in all new developments taking account of national guidelines and development management policies for rural and urban areas.

Source Westmeath County Council: Westmeath County Development Plan 2021–2027 (2021–2027) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions