- Chapter 11: Development Management Standards359 –– In the event that the developer proposes to modify the type of wind turbine in a way that may lead to increased noise levels at noise sensitive receptors, a noise assessment shall be undertaken, to be agreed with the Planning Authority, to demonstrate that relevant noise limits shall not be exceeded; –– Noise levels, including the addition of any penalties for special audible characteristics, shall comply with current guidelines; –– Any proposed lower fixed noise limit for night-time at noise sensitive properties shall not exceed 38 dB(A) L90 or 5dB(A) above background noise levels, whichever is the greater; –– Cumulative low frequency noise levels for one-third octave bands between 10 Hz and 160 Hz ( LpA,LF) from wind turbines shall not exceed 20 dB(A) at evening and night (19:00 to 07:00 hours) and 25 dB(A) during the day (07:00 to 19:00 hours), at any wind speed inside habitable rooms of noise sensitive properties when measured at locations meeting the requirements of the Environmental Noise Regulation of Denmark (Orientering nr. 45); –– Where noise levels interfere with the amenities of the area, the operator shall comply with any requirements of the Planning Authority to undertake an investigation (including shutting down wind turbines for background noise monitoring if required) and implement mitigation measures, up to and including taking turbine(s) out of operation. The Planning Authority may approve a testing programme to demonstrate compliance before turbine(s) are returned to operational service; –– Any noise assessments undertaken in the consideration of a windfarm noise shall be prepared by a suitably qualified professional that can demonstrate sufficient expertise. •• All proposals shall be referred to the Irish Aviation Authority for comment prior to submission; •• Appropriate setback distance shall be determined on a case-by-case basis in line with the Wind Energy Guidelines 2006 and any subsequent update; •• Peatland hydrology - The influence that wind farms have on their surroundings varies depending on the sensitivity of the development location. In upland peat sites for example, there can be marked effects on peatland hydrology. An in-depth study of peat morphology, hydrology and vegetative cover will be required; •• Ecological survey - Prior to the commencement of the development, a base-line ecological survey shall be carried out and submitted to the Planning Authority for use in monitoring the development. The site shall be resurveyed on an annual basis for five years after the commencement of the operation of the wind turbines and the information submitted to the Planning Authority; •• A restoration and after-care programme, devised and agreed upon by the interested parties should be furnished before granting planning permission. An on-site hydrological monitoring and amendment programme to be agreed for the construction and operating phase of the development; •• Bonds - Adequate bonds (agreed between the developers and the Planning Authority) shall be provided to meet the costs of agreed remedial and restorative works necessitated by the proposed development; •• Timing and scheduling of site works to take into account the seasonal nature of wildlife activities, such as breeding seasons and site conditions; •• The Planning Authority may grant permission for a duration longer than 5 years if it is considered appropriate, for example, to ensure that the permission does not expire before a grid connection is granted. It is, however, the responsibility of the applicants in the first instance to request such longer durations in appropriate circumstances.
- LIMERICK DEVELOPMENT PLAN 2022-2028360 Wind energy developments will not be permitted within those areas as identified in Chapter 9: Climate Action, Flood Risk and Transition to Low Carbon Economy, Map 9.1. Wind farms should be located, wherever possible, within the following types of landscapes: •• On agricultural lands; •• On degraded peats; or •• In a man-modified landscape. With regard to Landscape Character Areas in Limerick, in general, Shannon Integrated Coastal Management Zone single lines of equally spaced turbines are recommended to reduce the scenic impact. In the Agricultural Lowlands a more regular arrangement of turbines with equal spacing is recommended which takes into account field boundaries. In relation to archaeological sites, it is recommended that turbines are located three times the turbine height away to prevent visual domination. In the case of particularly sensitive sites, the applicant may be requested to relocate the turbine. Windfarms on undesignated lands will normally be permitted, subject to compliance with the general wind energy guidelines above, unless it is clear that the windfarm would affect a designated site, or a site which is in the process of survey/ designation. If a development is to go ahead, the following conditions shall apply: •• Avoid deep peat; •• Avoid wet areas, flushes and easily eroded soils; •• Avoid areas important for rare or endangered breeding birds and other important species; •• Avoid bird flight lines; •• Avoid construction work outside the period July to October where possible; •• Avoid drains discharging onto peat areas; •• Avoid stock grazing on disturbed peats. The following general guidelines shall be taken into consideration during and after construction: During construction: •• The floated road method of construction should be used as widely as possible. Floating roads should be constructed according to standard specifications, by laying geo-textile on the undisturbed bog surface along the route of the road and build the road on the geo-textile; •• Maximum possible use to be made of existing on site roads and laneways; •• Where new roadways have to be constructed, these should follow contours as much as possible, rather than run perpendicular to them and avoid, where possible, areas of deep or regenerating peat; •• Adequate under road methods of transferring of water should be installed in all places of known or suspected water movement, e.g. channels, emphasis on water spreading not water concentrating. Silt traps and small settling ponds should be used where necessary. These should be emptied regularly to ensure correct functioning; •• Sub-surface cabling should be adjacent to or within road shoulders. Short cuts across virgin bog will not normally be permitted; •• Peat spoil from excavated tracks should be used to mask new stone built or stone constructed surfaces, with the exception of cut rock faces; •• Disturbed surfaces suspected of having a poor chance of reverting to a vegetated state should be subjected to some restorative procedures, e.g. appropriate reseeding or mulching.
- Chapter 11: Development Management Standards361 After Construction: •• Grazing should be prohibited for three years after construction on peatland sites; •• On site hydrological conditions to be monitored following construction for five years and amended where necessary. Additional drainage relief procedures to be installed where water concentration becomes obvious in areas where it has not concentrated before the development began; •• Notwithstanding any advances in technology the height and type of turbines will be determined by visual and landscape considerations. *Refer to Guidance Note on Noise Assessment of Wind Turbine Operations at EPA Licensed Sites (NG3), 2011 for information regarding noise generation. 11.7.2.2 Solar There have been a number of large-scale solar farm applications in Limerick in recent years. In the assessment of any applications for solar farms, the Council will consider these renewable energy developments having regard to: •• Any future Section 28 Guidance; •• Location design, specifications, orientation of the development; •• Landscape Character Areas of the County; •• Visual impact, zones of influence from the solar arrays and associated infrastructure such as road access; •• Glint and Glare Assessments on roads, including in the vicinity of the strategic national road network, and other sensitive receptors; •• Archaeological Impact Assessment and Heritage Impact Assessment; •• Ecological Impact Assessment; •• Landscaping plans to integrate the development into the landscape; •• Security requirements such as CCTV, security lights, fencing etc.; •• Impacts from lighting; •• Construction impacts; •• Impacts on drainage patterns and water tables; •• Suitability of and access to the electricity grid; •• Decommissioning Plan for a site and its associated technologies. For solar panels on existing structures, an outline of the possible visual effects of the development will be required. For larger scale developments this may take the form of photomontages. Details of grid connections, where applicable and alterations to existing electricity cables that are open to public view are to be provided. Note, this may not be necessary in the case of stand-alone developments intended to serve individual dwellings. 11.7.2.3 Biogas/Bio-energy/Bio-mass and Innovative Energies Aligned with national policy, the Council acknowledges the robust contribution innovative energy solutions make to Ireland’s transition to a low carbon society. Innovative energy systems provide opportunities for rural diversification using indigenous renewable resources such as as biomass, energy crops, forestry material, biogas and farm slurry. Other alternative energy generation projects include hydroschemes, wave and tidal power, harnessing landfill gas and sewage sludge. These contemporary energy projects have a role in securing Ireland’s future energy supply and create opportunities to export power. General requirements of planning applications for such development are outlined below. This is not exhaustive and the Council will be guided by the advisory function of Prescribed Bodies in relation to planning applications. •• Planning history of the site; •• Planning justification and assessment of the project outlining how the project is implementing current national, regional and local policy in relation to sustainable energy;
- LIMERICK DEVELOPMENT PLAN 2022-2028362 •• Waste management and disposal, Waste Disposal and Asbestos Assessment if refurbishing existing structures; •• Technical specifications of all structures on site including plant buildings, storage facilities, processing structures such as tanks, generators, control buildings, flare stacks, substations, staff facilities, parking provision etc.; •• Natural heritage, environmental reports (EIAR and AA), ground conditions, impact on ground waters and surface waters, drainage and flood risk; •• Landscape Character Area as designated under this Plan; •• Ground conditions, hydrology, geology, hydrogeology, impact on ground water and surface waters; •• Implication for traffic including safety, trip generation and movement during construction and at operational stage, transport of the flammable material, impact on road network; •• Water services availability; •• Connection to the National Grid; •• The developer will be requested to submit as part of the planning application a Noise Assessment in accordance with BS 4142:2014+A1:2019 Methods for Rating and Assessing Industrial and Commercial Sound, establishing potential adverse effects at noise sensitive receptors and any necessary noise mitigation measures. The assessment should be prepared by a suitably qualified professional with sufficient expertise; •• Mitigation measures for odour and dust nuisance for public health; •• Visual impact; •• Source and volume of raw material, processing methods including a Nutrient Management Plan if relevant. Details of the destination of final product and method of transport; •• Landscaping, security and fencing. 11.7.3 Energy Networks The Council recognises the strategic and economic importance of investment in networks and energy infrastructure and will be guided by the Government Policy Statement on the Strategic Importance of Transmission and Other Energy Infrastructure, Department of Communications, Energy and Natural Resources, 2012 and any subsequent replacement national policy document. The Council will assist ESB Networks, Eirgrid and Gas Networks Ireland to improve the distribution networks for electricity and gas throughout Limerick. When assessing proposals, the Council will take the following into account: •• Proper planning and sustainable development of the areas including the economic and social significance of the proposed development; •• Environmental impacts including the protection of European designated areas (NHAs, pNHAs, SPAs, SACs, National Monuments, Protected Views and the Landscape Characters as designated by this Plan; •• Mitigation measures where impacts are inevitable; and •• Cumulative impact of the proposal.
- Chapter 11: Development Management Standards363 11.8 Transport and Infrastructure The potential impact of any development on the public road network is an important consideration of the Planning Authority when assessing a planning application for development. 11.8.1 Access to Roads, Traffic and Transport Assessments (TTAs) and Road Safety Audits (RSAs) Proposals seeking access to public roads will be accessed in accordance with the relevant design standards; with relevant TII Publications in rural areas; the Design Manual for Urban Roads and Streets (DMURS) in urban locations and the Spatial Planning and National Roads - Guidance for Planning Authorities 2012, the Whole of Government National Disability Inclusion Strategy (NDIS) 2017-2022 and TII guidance and publications. To protect the integrity of Limerick’s road network the following applies: •• There is a presumption against access onto motorway, national roads, strategic regional roads and regional roads in the interest of safety, preserving the capacity and the efficiency of these roads; •• There is a presumption against the removal of on-street parking space to facilitate the provision of vehicular entrances to single dwellings in predominantly residential areas, where residents are generally reliant on onstreet parking space; •• All applications seeking access on the road network will be assessed in accordance with national standards and guidance. Considerations will include: –– Classification of the road, –– Speed limit, –– Width, carrying capacity, condition of the road, drainage, vertical and horizontal alignment of the road, junctions in the vicinity, –– Nature, scale, type of activity seeking access to the road network, –– Traffic likely to be generated, type of vehicles, –– Technical design of access and sightline visibility and stopping distances and general safety. Sight distances and stopping sight distances should be in compliance with current NTA road geometry standards and guidance documents listed above and any subsequent documents. •• Developers will be required to submit a Traffic Impact Assessment/Traffic and Transport Assessment and/or Road Safety Audit where a new development will have a significant effect on the travel demand and capacity of the existing road network in the area. Refer to Traffic and Transport Assessment Guidelines PE-PDV-02045, TII 2014 (available on tiipublications.ie) and the Spatial Planning and National Road Guidelines, 2012. Refer to Section 3.4 of the 2012 Guidelines for further information on the methodology when preparing TTAs. The Council will also be guided by the Traffic Management Guidelines 2017 (available on gov.ie) and any subsequent national guidance documents. Road Safety Audits are required for developments seeking a new access onto a national road, or a significant change to a new access, or the intensification of the use of an existing access due to the activities undertaken on the site. They may be requested for other categories of road. Guidance on the methodology of the road safety audit are available in the TII publications Road Safety Audit Guidelines GE-STY-01027, 2017; •• In addition to the above, developers may be required to submit a Road Safety Impact Assessment (RSIA). RSIA is a separate process to RSA. While RSA examines the safety aspects within a scheme, RSIA considers the safety impact of a scheme on the surrounding road network. RSIA and RSA both work to improve the safety performance of new roads and existing roads that require modifications due to projects or proposals. Both have consequences for the design and layout of any project.
- LIMERICK DEVELOPMENT PLAN 2022-2028364 11.8.2 Building Lines With regard to building lines, the Council will require a minimum setback distance from roads according to classification, as per the following table. Exceptions may be made (apart from new national roads) where the applicant demonstrates the application of good acoustic design, meeting the objective outlined in Section 11.3.12 Noise, that acceptable noise levels can be achieved externally and internally with openable windows. Table DM 8: Building Lines on Public Roads Road Category Minimum building line from the near road edge County Roads and Regional Roads 20 m. National Primary and National Secondary Roads 30 m. New National Primary Roads 90 m. Developers of rural houses should consider staggering their building line and seek to avoid a regular minimum setback as established by existing houses if feasible, in the interest of visual amenity subject to protection of the existing residential amenity and without compromising effluent disposal. 11.8.3 Car and Bicycle Parking Standards While the national transport policy is one of modal shift away from the private car to more sustainable means of mobility, provision must be made in the Plan for sufficient car parking as many areas of Limerick are currently poorly serviced by frequent public transport networks. All planning applications will consider parking provision whilst bearing in mind the need to promote modal shift in the interest of achieving national Greenhouse Gases (GHG) targets and healthier, more active lifestyles. The parking zones in Limerick City and Suburbs (in Limerick), Mungret and Annacotty are the same as the density zones which are set out in Section 2.3.5.2 Density in Chapter 2: Core Strategy. * Table DM 9 (a) addresses car parking and bicycle parking requirements for Limerick City and Suburbs (in Limerick), Mungret and Annacotty according to the parking zones. Table DM 9 (b) address car parking and bicycle parking requirements for the key settlement of Newcastle West and the other settlements in the County.
- Chapter 11: Development Management Standards365 Table DM 9(a): Car and Bicycle Parking Standards Limerick City and Suburbs (in Limerick) Mungret and Annacotty Land Use Car Parking Spaces required – maximum spaces per unit/Gross Floor Area (GFA) Bicycle Parking Spaces required – minimum spaces per unit/Gross Floor Area (GFA) Zone 1* Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 Residential Dwelling <3 bedroom 0.5 spaces per unit 1 spaces per unit 1.5 space per unit 1 space per unit 1 space per unit 1 space per unit Visitor/short term 1 space per 2 units 1 space per 2 units 1 space per 2 units Dwelling 3 bedroom + 0.75 space per unit 1.5 spaces per unit 2 spaces per unit 2 spaces per unit 2 spaces per unit 2 spaces per unit Visitor/short term 1 space per 2 units 1 space per 2 units 1 space per 2 units Apartment 1-2 bed 0.5 spaces per unit 1 spaces per unit 1 spaces per unit 1 space per unit 1 space per unit 1 space per unit Visitor/short term 1 space per 3 units 1 space per 3 units 1 space per 2 units 1 space per 2 units 1 space per 2 units Apartment 3 bedroom 1 space per unit 1.5 spaces per unit 2 spaces per unit 2 spaces per unit 2 spaces per unit 2 spaces per unit Visitor/short term 1 space per 3 units 1 space per 3 units 1 space per 2 units 1 space per 2 units 1 space per 2 units Sheltered Housing 0.25 spaces per unit 0.5 spaces per unit 0.5 spaces per unit 1 space per 4 units 1 space per 4 units 1 space per 4 units Visitor/short term 1 space per 8 units 1 space per 6 units 1 space per 6 units Build to Rent incl. Student Accommodation 1 space per 20 beds 1 space per 15 beds 1 space per 10 beds 1 space per 5 beds 1 space per 5 beds 1 space per 5 beds + 1 shared car club + 1 shared car club + 1 shared car club Infill development and building refurbishment For building refurbishment schemes on sites of any size or urban infill schemes on sites of up to 0.25ha., car parking provision may be relaxed in part or whole, on a case-by-case basis, subject to overall design quality and location. Bicycle infrastructure – location, quantity, design and management as per Section 4.17 of the Sustainable Urban Housing: Design Standards for New Apartments – Guidelines for Planning Authorities, DHLGH2020 and National Cycle Manual, NTA 2012
- LIMERICK DEVELOPMENT PLAN 2022-2028366 Land Use Car Parking Spaces required – maximum spaces per unit/Gross Floor Area (GFA) Bicycle Parking Spaces required – minimum spaces per unit/Gross Floor Area (GFA) Zone 1* Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 Retail Retail convenience >100sqm 1 space per 60sqm 1 space per 40sqm 1 space per 30sqm 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff Retail convenience <100sqm none none none 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff Retail Comparison 1 space per 200sqm 1 space per 100sqm 1 space per 50sqm 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff Retail bank/ business/ financial services < 100sqm none none 1 space per 50sqm 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff 1 space per 100sqm + 1 space per 5 staff Retail bank/ business/ financial services > 100sqm 1 space per 200sqm 1 space per 150sqm 1 space per 100sqm 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff Retail Warehouse 1 space per 100sqm 1 space per 50sqm 1 space per 50sqm 1 space per 500sqm GFA + 1 space per 5 staff 1 space per 500sqm GFA + 1 space per 5 staff 1 space per 500sqm GFA + 1 space per 5 staff Service Stations Retail outlets in service stations** 1 space per 50sqm net retail space 1 space per 35sqm net retail space 1 space per 20sqm net retail space 1 space per 50sqm net retail space + 1 space per 5 staff 1 space per 50sqm net retail space + 1 space per 5 staff 1 space per 50sqm net retail space + 1 space per 5 staff Takeaway/ Fast-food Restaurant/ café/bar/ lounge<100sqm none 1 space per 50 sqm public floor area 1 space per 30 sqm public floor area 1 space per 50sqm public floor + 1 space per 5 staff 1 space per 50sqm public floor + 1 space per 5 staff 1 space per 50sqm public floor + 1 space per 5 staff Takeaway/Fastfood Restaurant/ café/bar/ Lounge>100sqm 1 space per 100sqm 1 space per 50sqm 1 space per 30sqm 1 space per 50sqm public floor + 1 space per 5 staff 1 space per 50sqm public floor + 1 space per 5 staff 1 space per 50sqm public floor + 1 space per 5 staff Consideration should be given to providing some short-term cycle parking for Cargo Bikes or Tricycles, for developments where there may be a demand, such as retail.
- Chapter 11: Development Management Standards367 Land Use Car Parking Spaces required – maximum spaces per unit/Gross Floor Area (GFA) Bicycle Parking Spaces required – minimum spaces per unit/Gross Floor Area (GFA) Zone 1* Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 Recreational/active health activities and entertainment and cultural facilities Cinema, Theatre, Stadia, Conference Centre 1 space per 50 seats 1 space per 25 seats 1 space per 20 seats 1 space per 20 seats + 1 space per 5 staff 1 space per 20 seats + 1 space per 5 staff 1 space per 20 seats + 1 space per 5 staff Gym/sports club 1 space per 100sqm 1 space per 75sqm 1 space per 50sqm 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff 1 space per 200sqm + 1 space per 5 staff Collective Sports Hubs – games pitches none 20 spaces per pitch 25 spaces per pitch 1 space per 20 seats or 10 spaces per pitch - negotiable 1 space per 20 seats or 10 spaces per pitch - negotiable 1 space per 20 seats or 10 spaces per pitch - negotiable Community facilities Hospital 1 space per 100sqm 1 space per 75sqm 1 space per 50sqm 1 space per 5 staff + 1 space per 20 beds 1 space per 5 staff + 1 space per 20 beds 1 space per 5 staff + 1 space per 20 beds Nursing Homes 1 space per 4 beds 1 space per 4 beds 1 space per 4 beds 1 space per 5 staff 1 space per 5 staff 1 space per 5 staff Medical Centres/ consulting rooms 1 space per treatment room + 1 space per 2 staff 1 space per treatment room + 1 space per 2 staff 1 space per treatment room + 1 space per 2 staff 1 space per 2 treatment rooms + 1 space per 2 staff 1 space per 2 treatment rooms + 1 space per 5 staff 1 space per 2 treatment rooms + 1 space per 5 staff Places of worship*** 1 space per 5 seats max or 1 space per 100sqm of worship area 1 space per 5 seats max or 1 space per 100sqm of worship area 1 space per 5 seats max or 1 space per 100sqm of worship area 10% of number of car park spaces 10% of number of car park spaces 10% of number of car park spaces Community Centres, library, museum, art gallery Case by case Case by case 1 space per 100sqm public floor area incl. meeting rooms 1 space per 100sqm public floor area + 1 space per 5 staff 1 space per 100sqm public floor area + 1 space per 5 staff 1 space per 100sqm public floor area + 1 space per 5 staff Funeral Homes 4 spaces per parlour + 1 space per 2 staff 4 spaces per parlour + 1 space per 2 staff 5 spaces per parlour + 1 space per 2 staff 2 spaces per parlour + 1 space per 2 staff 2 spaces per parlour + 1 space per 2 staff 2 spaces per parlour + 1 space per 2 staff Allotments 1 space per 4 allotments 1 space per 4 allotments 1 space per 2 allotments 1 space per 5 allotments 1 space per 5 allotments 1 space per 5 allotments
- LIMERICK DEVELOPMENT PLAN 2022-2028368 Land Use Car Parking Spaces required – maximum spaces per unit/Gross Floor Area (GFA) Bicycle Parking Spaces required – minimum spaces per unit/Gross Floor Area (GFA) Zone 1* Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 Education All schools 1 space per classroom + set down 2 spaces per classroom + set down 2 spaces per classroom + set down 10% pupil numbers - minimum 10 places 10% pupil numbers - minimum 10 places 10% pupil numbers - minimum 10 places Third Level Case by case Case by case Case by case 1 space per 4 staff + 1 space per 20 students**** 1 space per 4 staff + 1 space per 20 students**** 1 space per 4 staff + 1 space per 20 students**** Pre-school/ crèche Childcare/ afterschool 1 space per 80sqm + set down 1 space per 60sqm + set down 1 space per 40sqm + set down 1 space per 3 staff 1 space per 3 staff 1 space per 3 staff Enterprise and Employment Large scale office business/ professional 1 space per 200sqm 1 space per 150sqm 1 space per 150sqm 20-25% staff no.***** 20-25% staff no.***** 20-25% staff no.***** High Tech science 1 space per 200sqm 1 space per 150sqm 1 space per 100sqm 20-25% staff no.***** 20-25% staff no.***** 20-25% staff no.***** General manufacturing 1 space per 300sqm 1 space per 200sqm 1 space per 100sqm 20-25% staff no.***** 20-25% staff no.***** 20-25% staff no.***** Data Centre Not Permitted 1 space per staff + 2 visitor spaces 1 space per staff + 2 visitor spaces 20-25% staff no.***** 20-25% staff no.***** 20-25% staff no.***** eWorking hubs Case by case 1 space per 3 desks 1 space per 3 desks 20-25% desk no. 20-25% desk no. 20-25% desk no. Commercial storage distribution/ logistics Not applicable 1 space per 500sqm 1 space per 500sqm 20-25% staff no.***** 20-25% staff no.***** 20-25% staff no.***** Tourism Hotel/ Aparthotel 1 space per 3 rooms + 1 shared car club 1 space per 2 rooms + 1 shared car club 1 space per room + 1 shared car club 1 space per 10 beds + 1 space per 5 staff 1 space per 10 beds + 1 space per 5 staff 1 space per 10 beds + 1 space per 5 staff Hostel 1 space per 20 beds 1 space per 15 beds 1 space per 10 beds 1 space per 10 beds + 1 space per 5 staff 1 space per 10 beds + 1 space per 5 staff 1 space per 10 beds + 1 space per 5 staff B&B/ Guesthouse 1 space per bedroom 1 space per bedroom 1 space per bedroom 1 space per 3 bedrooms 1 space per 3 bedrooms 1 space per 3 bedrooms
Source Limerick City and County Council: Limerick Development Plan 2022–2028 (as varied) (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.