  1. Chapter 11: Development Management Standards349 •• Limit the numbers of signs where it is considered they would lead to a cluttered appearance at a junction or on a building; •• On buildings and structures of historic, artistic and architectural interest, only permit advertising which is in character with the building or structure; •• Provide an advertising area or advertising facility in central or focal areas in towns or villages and in lay-bys; •• Limit advertising in areas of special amenity, areas where views and prospects of scenic importance are listed, recommended maximum size of 1 sqm.; •• Restrict the use of advertising structures on public footpaths and on road margins where they conflict with pedestrian or traffic safety or with visual amenity. Large advertising hoardings (bill boards) will be prohibited in the countryside and will only be considered as temporary structures in towns and villages where they screen a derelict site; •• Permit fingerpost signs or advance signs for tourist attractions where they do not conflict with traffic safety; •• Permit the use of finger post signs for hotels, restaurants, sports and community facilities, where they do not conflict with traffic safety or visual amenity, within towns and villages; •• Permit the use of finger post signs for B&B’s, restaurants or large traffic generating business where they do not conflict with traffic safety or visual amenity, outside towns and villages. The establishment shall be within 5km of the location of the sign and shall not have a finger post sign at more than one junction on a major route; •• Encourage the use of informational signage with respect to biodiversity, ecology and climate adaptation measures at specific locations throughout Limerick. Particular attention will be paid to the design and location of new advertising in those areas where the Council intends to implement town and village improvement schemes in order to maximise the potential environmental benefits of such schemes and also in areas that are the subject of Local Area Plans; •• Digital advertising may be permitted, in certain locations subject to design, size, detail and level of illumination and the number of existing advertising signs on the shopfront (or similar). 11.6.5 Street Furniture Limerick City and County Council will exercise control over the location and quality of street furniture in the interests of creating a high-quality public domain. All outdoor furniture provided by private operators including retailers, publicans and restaurateurs, etc. should be located to prevent any obstruction or clutter of the footpaths and paved areas and should reflect highest quality, preferably of good contemporary design and respect the overall character of the area and quality of the public realm. Street furniture requires either a licence under Section 254 of the Planning and Development Act 2000 (as amended) or planning permission (including street furniture erected on private lands). In both instances, the applicant is required to submit details of the location, design, specification and quality of the proposed elements of street furniture. In considering applications for outdoor tables and chairs, the Planning Authority shall have regard to the following: •• Size and location of the seating area and the facility it will service; •• Concentration of existing street furniture in the area; •• The visual impact of the structure, particularly in relation to the colour, nature and extent of advertising on all ancillary screens; •• Impact on the character of the streetscape; •• The potential impacts of adjoining residential amenity in relation to hours of operation, noise and general disturbance; •• Impact on access and visibility.
  2. LIMERICK DEVELOPMENT PLAN 2022-2028350 11.6.6 Night Clubs/Licensed Premises/ Casinos/Private Members’ Clubs Nightclubs, disco bars and public houses play an important role in providing a night-time use. They will not however, be permitted in residential areas. Noise at the boundaries of these establishments will be carefully monitored and noise insulation and reduction measures will be required at the time of the submission of the planning application. •• Entertainment noise levels ( LAeq) from venues shall be less than 5dB above the background noise level ( LA90) when measured outdoors, in each octave band at the noise sensitive locations. Entertainment noise levels from venues in the 63 Hz and 125 Hz octave centre frequency bands shall also not exceed 47 dB and 41 dB ( LZeq) inside habitable rooms of noise sensitive properties, respectively. Sound insulation and noise control measures (including relating to any mechanical ventilation or air-conditioning) will be required to be submitted with any planning application; •• Noise from music events (e.g. large outdoor concerts) shall be required to be controlled by implementing measures recommended in the Code of Practise on Environmental Noise at Concerts (1995). An over concentration of such developments in a particular area, either through redevelopment, refurbishment, or extension will also not be permitted. In applications for such developments the onus will be on the applicant to demonstrate that the proposed new entertainment use, an extension to an existing entertainment use, or variation in opening hours, would not cause harm to residential amenity, environmental quality or the established character and function of the area. Smoking areas associated with such premises require planning permission and will be assessed having regard to the impacts on the general amenities of the area in question. 11.6.7 Small Scale Home-based Businesses in Rural Areas In general, commercial activities should be accommodated in towns and villages where existing services and facilities are available. However, the Planning Authority recognises that there are circumstances where there is a need for self-employed and small-scale commercial activities, located adjacent to and/or within the curtilage of existing houses in the open countryside. The Planning Authority will therefore seek to balance the need for such proposals against the impact on existing residential amenity and the environment. Proposals that involve the change of use or new development for purposes of homebased employment will be assess under the following criteria: •• The nature and operation of the use requires that it is located adjacent to the existing residence of the applicant; •• It is of an appropriate design and scale for its location and does not detract from the rural character of the area; •• It would not seriously injure the amenities of adjoining residences in terms of general disturbance, noise, traffic generation etc.; •• It does not adversely impact on traffic safety and capacity in the area. •• Adequate landscaping/screening is provided; •• Permission will be subject to normal environmental and planning criteria. Any subsequent change or proposed expansion of the business will need to be reconsidered by the Planning Authority to assess whether the premises or location would still acceptable.
  3. Chapter 11: Development Management Standards351 11.6.8 Agricultural Buildings, Re-use of Redundant Farm Buildings, Farm Diversification The following is general guidance for prospective development •• Agricultural buildings and associated works (walls, fences, gates, entrances, yards etc.), while accepting the need to be functional, are required to be sympathetic to their rural surroundings - in scale, materials and finishes. Traditionally this was achieved by having the roof darker than the walls. Appropriate roof colours are dark grey, dark reddish brown or a very dark green; •• The grouping of agricultural buildings will be encouraged and use of existing landscaping, in order to reduce their overall impact in the interests of visual amenity; •• Buildings should be located a minimum of 100m from the nearest dwelling other than the applicant’s/landowner’s dwelling; •• It should be demonstrated that there are no suitable redundant buildings on the farm holding to accommodate the proposed development. Some agricultural developments are exempt from planning control. However, no new building or structure on a farm is exempt from planning permission unless it has adequate effluent storage facilities. The Planning Authority will require adequate provision for the collection, storage and disposal of effluent produced from agricultural developments. Developers are required to adhere to the Department of Agriculture Guideline entitled Guidelines and Recommendations on the Control of Pollution from Farmyard Wastes and the following slurry storage and slurry disposal/ recycling requirements: •• All effluent storage tanks should be constructed to Department of Agriculture and Food specifications; •• The capacities of all slurry, effluent and soiled water tanks and all other tanks for pollutants shall comply with the current Department of Agriculture Guidelines and any subsequent documents/ guidelines; •• The applicant may be required to demonstrate that sufficient lands of suitable nutrient status are available within a reasonable distance for the disposal/recycling of organic waste from a proposed agricultural development. A Nutrient Management and Disposal Plan will be undertaken by a suitably qualified professional and submitted as part of the planning application to be assessed by the Council; •• A comprehensive Farmyard Management Plan shall be prepared by a suitably qualified Agricultural Advisor, which clearly demonstrates how compliance set out in the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2017 (as amended) will be achieved. The Farmyard Management Plan deals specifically with effluents arising on the farmyard – slurry, dairy washings, silage effluent, seepage from bedded animals, soiled water etc. Details required include slurry storage/capacity, soiled water storage/capacity and daily washings; •• Agricultural waste shall be managed in an environmentally sustainable manner in accordance with the principles set by the Rural Environment Protection Scheme, the Farm Waste Management Scheme and relevant EU and national legislation (in particular, the EC Good Agricultural Practice for the Protection of Waters Regulations 2017) (SI 605 of 2017).
  4. LIMERICK DEVELOPMENT PLAN 2022-2028352 The re-use of redundant farm buildings for small-scale rural enterprise will be considered where: •• The building was previously in agricultural use for a reasonable period; •• It is no longer required for agricultural purposes; •• The proposed use can be contained within the existing building; •• The traffic movements associated with the proposed development must not give rise to a traffic hazard; •• All waste associated with the proposed development must be stored and disposed of in accordance with the relevant legislation and guidelines and not impact on public health; •• The development can satisfy the various regulatory requirements for the particular use; •• Due consideration is given in the design to protective status if located within the curtilage of a Protected Structure. Proposals for farm diversification that involves the development of sustainable business initiatives that are subsidiary to and directly linked to the primary use of a property for agriculture will generally be favourably considered. The development of new rural enterprises will be considered on lands where: •• The scale and nature of the proposed development and associated buildings are appropriate to the rural setting and are in areas of low environmental sensitivity; •• It is demonstrated that the proposed enterprise is required to be located in a rural area; •• The proposal will not adversely affect the character and appearance of the landscape; •• The local road network and other essential infrastructure can accommodate any extra demand generated by the proposal; •• Where possible, the proposal involves the re-use of redundant or underused buildings that are of value to the rural area; and •• Where safe access to the public road network can be achieved. 11.6.9 Intensive Farm, Poultry and Piggery Development In assessing an application for intensive farming, pig or poultry units, the Planning Authority with other environmental and health authorities will ensure a high level of protection of the environment and human health prior to permitting the proposed development to proceed. The Council require information on the following: •• Depending on the scale of the proposed development and its location, an Environmental Impact Assessment Report (EIAR) may be required as part of the application. The EIAR will be prepared on behalf of the developer by a suitably qualified professional and will be assessed in accordance with Guidelines for Planning Authorities and An Bord Pleanála on carrying out Environmental Impact Assessment, 2018, DHPLG; •• Scale and intensity of operations, including the cumulative impact of similar types of developments and proximity to other activities such as residences, businesses etc.; •• Waste management including frequency and location of disposal relative to pig and poultry units. In addition, the applicant will be required to demonstrate that there is a stable, secure, sustainable outlet for all slurries and manures from the proposed development. All slurry and effluent shall be stored in concrete tanks constructed in accordance with S123 Minimum Specification: Slatted livestock units; Reinforced Concrete tanks (DAFF 1994) or other types of structures approved by the Planning Authority; •• The developer will be requested to submit as part of the planning application an Odour Impact Assessment, prepared by a suitably qualified professional with sufficient expertise to demonstrate odour abatement solutions, through appropriate modelling and monitoring procedures when operational;
  5. Chapter 11: Development Management Standards353 •• The developer will be requested to submit as part of the planning application, a Noise Assessment in accordance with BS 4142:2014+A1:2019 Methods for Rating and Assessing Industrial and Commercial Sound, taking account of the proposed increased animal numbers, on-site machinery including electrical substations, any potential adverse effects at noise sensitive receptors and any necessary noise mitigation measures. The assessment should be prepared by a suitably qualified professional with sufficient expertise; •• Proximity of development to aquifers and watercourses; •• Units should be located a minimum of 400 m. from the nearest dwelling other than the applicant’s dwelling. In the case of villages and towns, intensive poultry and particularly pig units will be required to be located a much greater distance away from the settlement because of the impacts on residential amenities; •• Animal housing units in terms of design and associated activities such as cleaning, ventilation and heating; •• A comprehensive Landscaping Plan should be submitted as part of the planning application; •• A Traffic Impact Assessment and a Road Safety Audit may be required. Refer to Section 11.8 Transport and Infrastructure of this chapter; •• An Industrial Emissions License (IEL) may be required from the Environmental Protection Agency. 11.6.10 Extractive Industry Mineral extraction including rock, sand and gravel can have serious impacts on the landscape, in terms of noise, dust, vibration, visual intrusion, loss of groundwater supplies, water pollution, loss of habitat, traffic generation and adverse impact on the road network. Constraints will be exercised in areas of archaeological importance, recorded monuments, areas of ecological importance and other environment designated areas such as the Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Natural Heritage Areas (NHAs). Any application will be assessed in accordance with: •• Planning Guidelines on Control of Quarries, DEHLH, 2006; •• Environmental Management Guidelines Environmental Management in the Extractive Industry (Non-Scheduled Minerals), EPA, 2006; •• Wildlife, Habitats and the Extractive Industry - Guidelines for the Protection of Biodiversity within the Extractive Industry, NPWS; •• Geological Heritage Guidelines for Extractive Industry, GSI; •• Code of Practice between the Department of the Environment, Heritage and Local Government and the Irish Concrete Federation; •• Compliance with Section 261 and Section 261A of the Planning and Development Act 2000 (as amended) and any subsequent national guidance and changes to legislation; •• Draft Policy Statement on Mineral Exploration and Mining in Ireland. Environmental Impact Assessment Reports (EIARs) will be required with a planning application, where the defined thresholds outlined in the Planning and Development Regulations 2001 (as amended) are exceeded for certain types of development. In cases where thresholds are not exceeded, the Planning Authority may still exercise its powers under Article 103(1) of the Regulations (2001) and require an EIAR for sub-threshold development, where it considers the effect of the proposed development on the environment is likely to be significant.
  6. LIMERICK DEVELOPMENT PLAN 2022-2028354 In assessing an application for development (whether for a new quarry or an extension to an existing), the need for the development in terms of national importance and the impact of the development on the local economy will be considered, together with the following: •• Nature and quantity of aggregate(s) to be extracted, including total and annual tonnage of excavated aggregates; •• Location - relative to dwellings or other development (within 1km of site), aquifers and groundwater, environmentally sensitive areas, special amenity areas and areas of archaeological potential in particular; •• Description of development works including buildings, mine shafts, fixed and mobile plant, roads, fuel tanks, stockpiles, storage of soil, overburden and waste materials, settling ponds; •• Estimated working life of quarry or mine, including phasing programme; •• Working methods, maximum extent and depth of working and hours of operation, including frequency of blasting etc.; •• Nature and extent of operations including ancillary processes (such as crushing, concrete manufacturer) and equipment to be used; •• Noise generation, vibration, subsidence; •• Dust generation and control; •• Waste disposal - waste rock, unmarketable products etc.; •• Water supply, de-watering and discharge requirements; •• Surface water management and flood risk minimization; •• Impact on water supply sources; •• Impact on water table: Minimisation of disturbance to the existing surface and subsurface hydrological regime must be ensured on site and in proximity to the quarry; •• Ecology: Due consideration must also be given to sites of ecological value and designated species which lie outside designated sites; •• Impact on any special designations including SACs, SPAs, NHAs, pNHAs, Protected Views, Protected Structures or curtilage of Protected Structures, archaeological designation and sensitivity; •• Ground Stability: This is not just an issue in shaft mining or underground quarrying but also relates to vertical surfaces left in place after stone, or aggregate extraction; •• Traffic generation and movement including the capacity of the road network; •• Impact on visual amenity of the landscape - A Landscape Visual Impact Assessment (LVIA) shall be submitted, including Zones of Theoretical Visibility (ZTV) which indicate the areas over which the proposed development may be seen. Representative assessment viewpoints should also be identified; •• Natural and proposed screening of site; •• Restoration/aftercare proposals/ schemes of rehabilitation – Aftercare proposals should be submitted with the planning application. Details should include appropriately scaled drawings of anticipated finished landform, the rehabilitation works proposed and surface/landscaping treatment, drainage of the site, details of the quality and the condition of topsoil. It should be noted that the record of past restoration by the developer will be taken into account. The Planning Authority will support the extractive and mineral extraction industry by issuing planning permission that extends over the estimated life of the quarry or mine. It will be necessary, however that the applicant sets out a phasing proposal for the development to assess the time-scale of the proposal. The Planning Authority will impose strict conditions on planning permissions relating to the appropriate mitigation measures to control the impacts on the environment and surrounding area. Limited duration on permissions may be issued by the Council to allow for re-evaluation of the development in light of unforeseen implications or changes in environmental standards and technology.
  7. Chapter 11: Development Management Standards355 A standard contribution and in certain circumstances, a special contribution under the Development Contribution Scheme and a financial bond will be required to ensure appropriate restoration and reinstatement works are undertaken within 12 months of the cessation of works. It is obligatory for new mining developments to obtain an Industrial Emissions License from the EPA. All aspects of air and water pollution, noise and waste are covered by this single integrated licence. Refer to dccae.gov.ie/ Minerals-Exploration-Mining. 11.6.11 Land Reclamation If you propose to drain or reclaim a wetland you must apply to Limerick City and County Council for planning permission. Permission is required where the area impacted by the works exceeds 0.1ha., or the works may have a significant effect on the environment. If you propose to drain or reclaim a wetland where the area impacted by the works exceeds 2 ha., the planning application will have to be accompanied by an Environmental Impact Statement (EIS). It is the policy of the Council to require all land reclamation development which includes the importation of any material onto site, have the requisite waste authorisation in accordance with the Waste Management Act 1996. The Council will be guided by the Guidance for Planning Authorities on Drainage and Reclamation of Wetlands, DEHLG, 2011 and the advice of other agencies such as the EPA when assessing applications. The Council will require at a minimum the following for reclamation/soil or stone recovery: •• A comprehensive assessment by a suitably qualified professional of the impact of the proposal on groundwater, surface water, aquifers and compliance with the Water Framework Directive; •• Impact on Natura 2000 sites, NHAs, sites deemed to be of ecological, geological or geomorphological importance; •• Details of the material to be introduced to the site having regard to the mandatory thresholds set out in Schedule 5 Part 2 of the Planning and Development Regulations 2001 (as amended ); •• Clear justification for the need for the proposal; •• Traffic generation to import material to the site, including traffic movement and safety on the road network; •• Details of site services if applicable; •• Details of phasing programme for the reclamation including appropriate layout and section drawings; •• Noise, dust emissions and measures to mitigate nuisance and public health; •• Measures to control the spread of invasive species. The Department of Agriculture, Food and Marine publication Environmental Impact Assessment (Agriculture) Regulations - Guide for Farmers is a useful resource for land reclamation.
  8. LIMERICK DEVELOPMENT PLAN 2022-2028356 11.7 Climate Action 11.7.1 Built Environment In order to achieve a more sustainable built environment, the Planning Authority will encourage the following measures: •• The retention, restoration and reuse of buildings in preference to their demolition and reconstruction where possible; •• Encourage the use of structural materials that have low to zero embodied energy and CO2 emissions; •• Buildings should be adaptable in design (see Criteria 9 of the Urban Design Manual 2009) in the case of residential developments; •• Applications of 1000+ sq.m. commercial development or applications of 30+ residential units shall include an Energy Statement setting out what energy efficiency and carbon reduction design measures are being considered; •• Where appropriate, a design statement addressing how the circular economy is addressed from design through to planned end-use; •• Incorporating Nature-Based Solutions (NBS) into the design of buildings and layout – living/green walls, living/ green and or blue roofs, including in the design of small buildings and shelters, other soft Sustainable urban Drainage Systems (SUDS) measures such as swales, rain gardens, using trees for urban cooling and the reduction of wind tunnel effect; •• Applicants should explore the potential for urban greening in developments including high quality landscaping (including tree planting) that make use of a diverse range of species of plants – consistent with the National Pollinator Plan, site appropriate and irrigated by rainwater. 11.7.1.1 Circular Economy for Building Design and Construction Projects The concept of the circular economy can be applied to the whole lifecycle of new developments, from planning and design right through demolition, construction, end-use and repurposing or end of life of a development. To adopt the principle of the circular economy more fundamentally, applicants shall be required to submit a Resource Management Plan, including a Circular Economy Statement, covering different phases of the project from initial design through to construction and end-use functioning. This approach would help the application of modular construction and the facilitation for easy repair and replacement of components and repurposing for reuse. Avoidance of demolition should be promoted in order to promote circularity and/or design for disassembly to facilitate reuse and recycling of materials back into a circular economy loop. An important source of information is the Environment Protection Agency’s Draft Best Practice Guidelines for the preparation of Resource Management Plans for Construction and Demolition Waste Projects. 11.7.2 Renewable Energy The Planning Authority notes that under current planning legislation, the Planning and Development Regulations 2001 (as amended), the inclusion of certain renewable technology is considered exempt development. All methods of energy production have impacts on the environment. Notwithstanding this, the need to adopt a more sustainable approach to energy production is acknowledged by the Planning Authority. They will be considered in the context of current Government policy on the subject but will take into account other, often competing, Council policies and any relevant guidelines issued from time-to-time by the Department of Housing, Local Government and Heritage.
  9. Chapter 11: Development Management Standards357 11.7.2.1 Wind Energy When assessing planning applications for wind energy developments the Planning Authority will have regard to the Wind Energy Development Guidelines for Planning Authorities (2006), published by the DoEHLG and the Interim Guidelines for Planning Authorities on Statutory Plans, Renewable Energy and Climate Change (2017) and any subsequent updates. The Planning Authority will also have regard to Chapter 9: Climate Action, Flood Risk and Transition to Low Carbon Economy. This Strategy has analysed suitable areas for wind energy in Limerick. •• The Council will be guided by the Wind Energy Guidelines, 2006, the recentDraft Wind Energy Guidelines, DHPLG, 2019 and any subsequent Section 28 guidance document. Applicants are advised to familiarise themselves with the documents when designing proposals. Developers should also refer to the Code of Practice for Wind Energy Development in Ireland, DCCAE, 2016 regarding observance with the best industry practices and with engagement of communities. With regard to EPA licensed developments, applicants are advised to refer to the EPA publication - Guidance Note on Noise Assessment of Wind Turbine Operations at EPA Licensed Sites (NG3), 2011; •• Wind farms with more than 25 turbines or that have a total output greater than 50MW are classified as Strategic Infrastructure Developments (SIDs) and are adjudicated by An Bord Pleanála as the competent Authority; •• Aspects to be considered by the Council when assessing planning applications for wind energy below SID thresholds include: –– Natural Heritage, including Environmental Assessments, the Landscape Character Areas of the Plan, or any future Seascape Character Assessment; –– Ground conditions, hydrology and topography, soil stability, surface drainage from all structures on site, including turbines, roads/tracks and substation; –– Geology and hydrogeology, impact on groundwater and watercourses, flood risk; –– Archaeology including National Monuments; –– Architectural heritage; –– Noise and mitigation measures for sensitive receptor locations such as residences; –– Shadow flicker and mitigation measures; –– Electromagnetic interference; –– Environmental and ecological aspects including European designated sites, EIAR, AA, SPAs, SACs, NHAs and pNHAs; –– Connection to the National Grid; –– Landscape and Visual Impact Assessment, including the size, scale and layout and the degree to which the wind energy project is visible over certain areas and in certain views; –– Traffic movement and safety, during construction and when in operation; –– Carbon emissions balance if the development requires peat extraction; –– Disposal or elimination of waste/ surplus material from construction/ site clearance, particularly significant for peatland sites; –– Information on the location of quarries to be used or borrow pits proposed during the construction phase and associated remedial works thereafter; –– Cumulative impact with similar windfarm development in the area; –– Community engagement, investment and dividend; –– Decommissioning and dismantling of the structures and access road/track and restoration of the site; and –– Previous planning history of the site.
  10. LIMERICK DEVELOPMENT PLAN 2022-2028358 The impact of wind energy development will vary depending on the location of the individual site, together with the number of turbines, layout, size, design and colour. The Planning Authority will take a flexible approach to the location within the city, larger settlements and County Limerick of one-off small scale wind turbines, i.e. of the type to which the Planning and Development Regulations 2001 (as amended) (S.I. No.83) refers to, where the turbine is just above the thresholds specified for exemption (13 m. in height). The location of such developments within settlements and, even in areas deemed unsuitable for wind energy development, will be open for consideration for smallscale wind turbines. In assessing proposals for micro-wind turbines which, due to their height or number are just above the limits of exemption, the developer will be expected to remain below most, if not all of the other thresholds specified in the aforementioned Regulations, e.g. in respect of distance of rotor blade from ground and noise standards. In assessing an application for a wind farm the following general guidelines shall be taken into consideration: •• Wind turbines will not be permitted on prominent ridges, valley rims or other prominent locations. The siting and layout of turbines should take advantage of existing screening within the landscape and where possible, should follow and respect local land forms; •• All turbines shall be similar in design and dimensions. All turbine blades shall rotate in the same direction. Turbine structures should be of matt finish and neutral colour and be reflected in the photomontage submitted; •• No structures other than wind turbines and the necessary substation shall be permitted. The structure enclosing the substation shall be finished in dark green/dark brown colour to minimise visual impact in the Irish landscape. This shall apply to all ground level components of the development. Landscaping proposals to reduce visibility of the ground level components of the development shall also be submitted; •• A Flood Risk Assessment may be required for the proposal; •• Road and associated development to be planned and designed on the basis of the EIAR information, so as to minimise peat extraction, reduce the necessity for its disposal and mitigate changes in the site’s hydrological regime. Access roads shall be uncovered and shall follow the natural contours of the site; •• Fencing shall be only allowed around the substation and not on any other parts of the site, unless agreed as part of a rehabilitation programme for on-site vegetation. The fencing shall then be permitted for the length of time required to ensure recovery of the vegetation; •• Wind speed monitoring - The applicant should demonstrate that wind speed monitoring has taken place in the last 12 months prior to the application being submitted and adequate wind speeds are available for the development. On sites with multiple turbines, the wind monitoring location shall be selected to be reasonably representative of the range of wind speeds considered to be experienced at the site; •• The Planning Authority shall be informed of the plan to carry out background noise surveys and to agree proposed monitoring locations. Background noise surveys shall be carried out in accordance with A Good Practice Guide to the Application of ETSU-R-97 for the Assessment and Rating of Wind Turbine Noise (2013), unless current guidelines require otherwise. –– Planning applications shall include noise-monitoring proposals over the lifetime of the development;

Source Limerick City and County Council: Limerick Development Plan 2022–2028 (as varied) (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions