- Chapter 10 –Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-6 10.2.1 Rural Water Programme Private supplies provide water to those areas not served by a public water supply. They comprise private Group Water Schemes serving local communities or private wells serving single dwelling houses. There are seven private Group Schemes operating in County Louth. The Council supports the continued operation and development of the private Group Scheme sector through the administering of subsidies and grants, as provided for under the Rural Water Programme. Policy Objective IU 12 To promote and support the development and proper management of Group Water Schemes in the County, subject to an appropriate level of treatment being provided and suitable robust operational arrangements being put in place. 10.2.2 Wastewater Treatment and Disposal Systems The provision of well-maintained quality wastewater treatment infrastructure is essential to facilitate sustainable development in the County, while also protecting the environment and public health. All wastewater, including domestic and trade, ultimately discharges to water, whether ground, surface or marine. Therefore, the provision of satisfactory waste water treatment and disposal is essential for the protection of the environment. Uisce Éireann is now responsible for the treatment and disposal of wastewater, where public wastewater facilities exist within settlements. All trade effluent requires an effluent discharge licence whether discharging to ground or surface waters. Domestic effluent discharging to surface waters and to ground waters (where the volume of discharge exceeds 5 cubic metres in any 24hr period) also requires a discharge licence. Treated wastewater discharging to ground and surface waters under licence, must not result in deterioration of the status of the water body and must comply with the groundwater and surface water regulations. The use of grey water collection and recovery systems may be considered subject to compliance with building regulations. The building regulations recommend that only water from washing machines and baths is used for this purpose and not from kitchen sinks and dishwashers. Policy Objective IU 13 To require that all development taking place within an area served by a public wastewater treatment system connects to that system. Policy Objective IU 14 To require that on lands identified for non-domestic development where no public waste water facility exists or is proposed, that the wastewater be adequately treated and discharged to suitable receiving water, subject to a discharge licence. Policy Objective IU 15 To promote rain water harvesting and grey water use in all developments and in particular for larger developments, as an alternative to attenuation.
- Chapter 10 – Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-710-7 10.2.3 On-site Wastewater Treatment Systems Louth County Council is the designated Water Authority for the assessment and approval of individual private domestic on-site wastewater treatment systems in the County. The main method of sewage disposal in rural areas is by means of individual septic tanks and proprietary wastewater treatment systems. The requirements for these systems are set out in the EPA Code of Practice Domestic Waste Water Treatment Systems, Population Equivalent ≤ 10 (2021). Policy Objective IU 16 To require that proper supervision, installation and commissioning of on-site wastewater treatment systems by requiring site characterisation procedures and geotechnical assessments be carried out by competent professionally indemnified and suitably qualified persons. Policy Objective IU 17 To require that the construction and installation of all wastewater treatment systems are supervised and certified by a suitably qualified competent person as fit for the intended purpose and comply with the Council’s requirements. Policy Objective IU 18 To require that private wastewater treatment systems for individual houses where permitted, comply with the recommendations contained within the EPA Code of Practice Domestic Waste Water Treatment Systems, Population Equivalent ≤ 10 (2021). 10.2.4 Water Drainage Louth County Council and Uisce Éireann have developed a Memorandum of Understanding (MoU) in respect of surface water drainage and flood management. With the construction of new development, less rainfall is absorbed into the ground with a corresponding increased volume and rate of flow to drains. This has the potential to cause localised flooding in streams and piped drains, in addition to bringing surface contaminants directly into water courses, causing pollution. 10.2.5 Sustainable Drainage Systems The Greater Dublin Strategic Drainage Study (GDSDS) produced five policy documents, which include: • Environmental Management; • Drainage of New Developments and; • Climate Change. These documents focused on the design approach and criteria for drainage infrastructure within new development to ensure it did not continue the trend of pollution and flooding of waterways.
- Chapter 10 –Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-8 Sustainable Drainage Systems (SuDS) can best be summarised as offering an integrated approach and total solution to rainwater management and is applicable to urban and rural areas. The SuDS technique is a method of replicating the natural characteristics of rainfall runoff from any site, ensuring water is infiltrated or conveyed more slowly to the drainage system and ultimately to water courses via permeable paving, swales, green roofs, rain water harvesting, detention basins, ponds and wetlands. These facilities are designed to prevent pollution of streams and rivers and minimise the impacts of urban runoff by its capture as close to the source as possible and its subsequent slow release so that development impact is neutral or positive on flooding. In addition to forming part of the County’s drainage infrastructure, SuDS can also provide amenity benefits to local communities and benefits for biodiversity simultaneously. Properly designed and located SuDS features can be incorporated within and can complement the amenity and aesthetic value of open spaces. Detailed measures in relation to SuDS techniques in all forthcoming Local Area Plans shall be appropriately designed to enhance biodiversity and amenities and to ensure the protection of environmentally sensitive sites and habitats, including where flood risk management measures are planned.
- Chapter 10 – Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-910-9 Policy Objective IU 19 To require the use of Sustainable Drainage Systems to minimise and limit the extent of hard surfacing and paving and require the use of SuDS measures be incorporated in all new development (including extensions to existing developments). All development proposals shall be accompanied by a comprehensive SuDS assessment including run-off quantity, run off quality and impacts on habitat and water quality. Policy Objective IU 20 To require all development proposals meet the design criteria, (adjusted to reflect local conditions), and material designs contained in the Greater Dublin Strategic Drainage Study (GDSDS) and demonstrate how runoff is captured as close to source as possible with subsequent slow release to the drainage system and watercourse. Policy Objective IU 21 To seek to avoid the discharge of additional surface water to combined sewers and promote Sustainable Urban Drainage Systems (SuDS) and solutions to maximise the capacity of towns with combined drainage systems. Policy Objective IU 22 To ensure all new development incorporates appropriate measures to protect existing water bodies, through appropriate treatment of runoff. In particular, discharges from car parks shall be appropriately treated so as to remove pollutant materials. Policy Objective IU 23 To ensure all new developments provide for separated drainage systems. Policy Objective IU 24 To encourage particularly in buildings of increased height the provision of green roofs and green walls as an integrated part of Sustainable Drainage Systems (SuDS) and which provide benefits for biodiversity, wherever possible. 10.2.6 Riparian Corridor A riparian corridor is the land directly adjacent to or surrounding a natural or artificial waterway and can include major and secondary rivers, wetlands, intermittent or permanent creeks and streams. The width of the riparian corridor may vary along the waterway and is dependent on location within the catchment (valley or floodplain) and the adjacent land use. These corridors provide a crucial link between terrestrial and stream ecosystems forming a unique and distinct unit within the surrounding landscape and are typically home to a diverse range of plant species.
- Chapter 10 –Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-10 Where it is necessary to maintain the ecological or environmental quality of a watercourse and in relation to watercourses of a significance conveyance capacity, it is necessary that there is a set back from the edge of watercourses to allow access for channel clearing and maintenance. A minimum setback of at least 10m (or other width, as determined by the Council) will be required on each side of the watercourse, depending on the width of the watercourse. Policy Objective IU 25 To ensure, where feasible, that no development including clearing or storage of materials takes place within a minimum distance of 10m measured from each bank of any river, stream or watercourse. 10.3 FLOOD RISK MANAGEMENT Flooding is a natural phenomenon of the hydrological cycle that can occur at any time, in a wide variety of locations, with significant impacts, threatening people’s lives, their property and the environment. Whilst instances of flooding have occurred in Louth, relative to other counties, the extent of this flooding has been low. However, given the reality of climate change, there are areas of the County which are at risk of coastal, fluvial, pluvial and estuarial flooding. Drainage and flood management are a central theme within the Louth Climate Change Adaptation Strategy 2019-2024, which has an overarching objective to manage the risk of flooding through a variety of responses. Coastal Flooding: Resulting from higher sea levels than normal causing the sea to overflow onto land. Such flooding is influenced by high tide level, storm surges and wave action. Pluvial Flooding: Resulting from high intensity rainfall events where run-off volume exceeds capacity of the surface water network. Fluvial Flooding: Watercourse capacity is exceeded or the channel is blocked and excess water spills from the channel onto adjacent floodplains. Estuarial Flooding: A combination of high tide and high river flows prevents water from flowing out to sea, causing water levels inland to flood river banks. Like other natural processes flooding cannot be completely eliminated, but its impacts can be minimised, with proactive and environmentally sustainable management of catchments, identifying areas vulnerable to flooding and by taking measures to ensure development does not individually or cumulatively contribute to an increase in flood risk. With climate change, there is a likelihood of increased rainfall and rising sea levels, which coupled with increased urbanisation means that flood risk to property is likely to increase in the future. 10.3.1 Flood Risk The Preliminary Flood Risk Assessment is a national screening exercise completed by the OPW, based on available and readily derivable information and undertaken to identify areas at potential of flooding. The PFRA study considered flooding from a number of sources, including fluvial, tidal, pluvial and groundwater and resulted in a national suite of broad scale flood maps. The PFRA is a requirement of the EU Floods Directive and the publication of the work has led to and informed more detailed assessment, which is being undertaken as part of the Catchment Flood Risk Assessment and Management (CFRAM) studies.
- Chapter 10 – Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-1110-11 It prioritised the areas of greatest potential risk from one or more sources of flooding and designated these as Areas for Further Assessment (AFA), of which there are eight identified in County Louth. Separate to this, Louth County Council produced the Dunleer Flood Study in 2016, which includes detailed Flood Mapping for Dunleer village. The OPW undertook the Catchment Flood Risk and Management (CFRAM) programme to elicit a comprehensive picture of flood risk in the AFA’s and identify how to effectively and sustainably manage this flood risk. This culminated in the OPW producing the following: ▪ Neagh Bann Flood Risk Management Plan; and ▪ Eastern Flood Risk Management Plan. The eight Areas for Further Assessment and their associated Flood Risk Management Plans are as outlined in Table 10.1. Implementing the measures set out in these plans requires significant capital investment in addition to prioritisation of this investment. Having been allocated funding, and in conjunction with the OPW, the Council is seeking to deliver on the following Flood Relief Schemes during the lifetime of this Plan: • Dundalk, Blackrock & Ardee Flood Relief Scheme; • Drogheda & Baltray Flood Relief Scheme; and • Carlingford & Greenore Flood Relief Scheme. The Strategic Flood Risk Assessment (SFRA) to be completed during the Plan making process in accordance with The Planning System and Flood Risk Management Guidelines (2009) has been appended to this Plan. These guidelines follow the principle that certain types of vulnerable development should not be permitted in flood risk areas, particularly flood plains, except where there are no alternative and appropriate sites available in lower risk areas that are consistent with the objectives of proper planning and sustainable development. Table 10.1 Areas for Further Assessment and their Associated Flood Risk Management Plan Area for Further Assessment (AFA) Flood Risk and Management Plan (FRAM) Annagassan Neagh Bann Ardee Neagh Bann Baltray Eastern Carlingford Neagh Bann Drogheda Eastern Dundalk & Blackrock Neagh Bann Greenore Neagh Bann Termonfeckin Neagh Bann
- Chapter 10 –Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-12 Flood zones are geographical areas within which the likelihood of flooding is in a particular range and they are a key tool in flood risk management. There are three types of flood zones defined in the guidelines. These are outlined in Table 10.2. The SFRA mapping identifies where Flood Zones A and B are most likely to occur, focusing on the smaller towns and villages throughout the County. Further mapping illustrates flooding in all urban and rural locations, which facilitates identification of areas within which development proposals will be subject to site specific Flood Risk Assessment. Table 10.2: Flood Zone Type Flood Zone Type Description A The probability of flooding is highest (greater than 1% or 1 in 100 for river flooding or 0.5% or 1 in 200 for coastal flooding) and where a wide range of receptors would be vulnerable B The probability of flooding is moderate (between 0.1% or 1 in 1000 and 1% or 1 in 100 for river flooding and between 0.1% or 1 in 1000 year and 0.5% or 1 in 200 for coastal flooding) C The probability of flooding is low (less than 0.1% or 1 in 1000 for both river and coastal flooding) Policy Objective IU 26 To reduce the risk of new development being affected by possible future flooding by: • Avoiding development in areas at risk of flooding and • Where development in floodplains cannot be avoided, taking a sequential approach to flood risk management based on avoidance, reduction and adaptation to the risk.
- Chapter 10 – Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-1310-13 Policy Objective IU 27 To ensure all proposals for development falling within Flood Zones A or B are consistent with the “The Planning System and Flood Risk Management – Guidelines for Planning Authorities” 2009. Proposals for development identified as being vulnerable to flooding must be supported by a site specific Flood Risk Assessment and demonstrate to the satisfaction of the Planning Authority that the development and its infrastructure will avoid significant risks of flooding and not exacerbate flooding elsewhere. In Flood Zone C, where the probability of flooding is low (less than 0.1%), sitespecific Flood Risk Assessment may be required and the developer should satisfy themselves that the probability of flooding is appropriate to the development being proposed. The County Plan SFRA datasets and the most up to date CFRAM Programme climate scenario mapping should be consulted by prospective applicants for developments in this regard and will be made available to lower-tier Development Management processes in the Council. Applications for development in flood vulnerable zones, including those at risk under the OPW’s Mid-Range Future Scenario, shall provide details of structural and non-structural risk management measures, such as those relating to floor levels, internal layout, flood-resilient construction, emergency response planning and access and egress during flood events. Policy Objective IU 28 To require development proposals within the settlement boundary of Dundalk to comply with the requirements of Policy Objective INF 21 of the Dundalk Local Area Plan 2025-2031. Policy Objective IU 29 Where a site specific Flood Risk Assessment demonstrates that there are significant residual flood risks to a proposed development or its occupiers in conflict with ‘The Planning System and Flood Risk Management – Guidelines for Planning Authorities’ 2009, planning permission will normally not be granted unless the requirements of Section 5.28 ‘Assessment of minor proposals in areas of flood risk’ can be satisfied. Policy Objective IU 30 To implement the Flood Risk Management Measures as detailed in the Neagh Bann Flood Risk Management Plan, the Eastern Flood Risk Management Plan and the Dunleer Flood Risk Management Plan, ensuring that proposals for development support and do not impede the progression of these measures. Louth County Council will, in partnership with the Office of Public Works (OPW) deliver the following Flood Relief Schemes: • Dundalk, Blackrock and Ardee; • Drogheda and Baltray; and • Carlingford and Greenore.
- Chapter 10 –Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-14 Policy Objective IU 31 To work with the Office for Public Works in the development and implementation of catchment-based strategies for the management of flood risk – including those relating to storage and conveyance. Policy Objective IU 32 To contribute towards the improvement and/or restoration of the natural flood risk management functions of flood plains subject to compliance with the environmental legislation and availability of resources. Policy Objective IU 33 To ensure each flood risk management activity is examined to determine actions required to embed and provide for effective climate change adaptation as set out in the OPW Climate Change Sectoral Adaptation Plan Flood Risk Management applicable at the time. Policy Objective IU 34 Where a portion of a site is at risk of flooding, the lands at risk will be subject to the sequential approach to ensure first and foremost that new development is directed towards lands at low risk of flooding; and to restrict the type of development to that ‘appropriate’ to each flood zone in accordance with Tables 3.1 and 3.2 of the Flood Risk Management Guidelines. Policy Objective IU 35 To consult with the Office of Public Works (OPW) in relation to proposed developments in the vicinity of drainage channels and rivers for which the OPW are responsible. Policy Objective IU 36 To consult with the Office of Public Works (OPW) in relation to proposed developments which include the construction, replacement or alteration of a bridge or culvert and to require that the developers obtain consent from the OPW under Section 50 of the EU (Assessment and Management of Flood Risks) Regulations 2010 and Section 50 of the Arterial Drainage Act 1945, where appropriate.
- Chapter 10 – Infrastructure & Public Utilities Louth County Development Plan 2021-2027 10-1510-15 10.3.2 PFRA Mapping PFRA mapping has been used to define the flood zones in places outside of the scope of the CFRAM Study and the Dunleer Flood Study. These areas should be treated with caution due to the indicative nature of the PFRA mapping. It is provided for information purposes to help identify areas where flood risk should be explored in greater detail. For this reason, all Zoning and Composite Mapping for each of the Settlements associated with the Development Plan clearly differentiate between flood zones derived from PFRA mapping and the CFRAM Study, on the attached legend. Any planning application on lands where pluvial flooding is identified will be required to include an assessment of the potential flood risks associated with the development of the lands together with any mitigating measures that will ensure the development and associated infrastructure will avoid significant risks of flooding and not exacerbate flooding elsewhere. 10.4 COMMUNICATIONS 10.4.1 Introduction Information and Communication Technologies (ICT) is a term used to cover the technical means of processing and communicating information, primarily involving digital technology. The importance of ICT is recognised in two ways. Firstly, access to fast, reliable and cost effective communications offsets the impact of geographic remoteness, increasing social inclusion, economic competitiveness and employment opportunities. Secondly, it can contribute to sustainability goals by reducing the need to travel e.g. home working which provides for a better home life balance with fewer car journeys and reduced greenhouse gas emissions. With respect to Telecommunication Technologies, the Council acknowledges its importance and seeks to promote and facilitate widespread telecommunication infrastructure throughout the County in order to achieve balanced social and economic development. The Council will promote the development of additional ICT infrastructure including broadband, telecommunication facilities, mobile phone coverage etc., to provide for the physical and economic development of County Louth subject to normal planning considerations. Policy Objective IU 37 To promote and facilitate the sustainable delivery of a high quality ICT infrastructure network throughout the County taking account of the need to protect the countryside and the urban environment together with seeking to achieve balanced social and economic development.