- 309 | P a g e CHAPTER 14 IMPLEMENTATION AND MONITORING 14.1 INTRODUCTION The Plan sets out the Council’s vision and strategy for the sustainable development of the County over the period 2021-2027 and includes a range of policy objectives that provide a framework for the future growth and development of the County. The Council has a statutory obligation to implement the provisions of the Plan and is committed to securing its objectives. The Council will progress the policy objectives of the Plan: • to advance Portlaoise and Graiguecullen as Key Towns, • to enhance economic activity, promote the transition to a low carbon County, and in particular, Portlaoise’ lead role as Ireland’s first low carbon town, • to promote the County’s unique cultural, built and natural heritage, • to develop sustainable communities ensuring sustainable use of natural resources. The implementation of the Plan is also dependant on a number of factors including collaboration with the community, key stakeholders, adjoining authorities, political support. Council funding and the availability of capital from other sources is also a key factor which, at present due to the uncertain economic climate as a result of COVID 19, may present a challenge in the years ahead. The Plan will also be regularly reviewed in light of new legislation or guidelines, to assess progress, and to determine where amendments are required, a variation of the Plan will be necessary. 14.2 LEGISLATIVE CONTEXT The Planning and Development Act 2000 (as amended) provides under: ➢ Section 15 (1) that it shall be the duty of a Planning Authority to take such steps within its powers as may be necessary for securing the objectives of the Development Plan, and; ➢ Section 15 (2) that the Manager of the Planning Authority shall, not more than 2 years after the making of a Development Plan, give a report to the members of the authority on the progress achieved in securing the objectives referred to in subsection (1). Planning and Development Regulations 2001 (as amended) provides under: Article13J(2) that the report required of the manager under section 15(2) of the Act shall include information in relation to progress on, and the results of, monitoring the significant environmental effects of implementation of the development plan’ 14.3 LOCAL AREA PLANS The policy objectives of the Plan provide a general framework, but not necessarily the detailed treatment required for significant proposals in certain towns. For a number of towns within the County, a more detailed local level of spatial planning is required through thedevelopment of Local Area Plans and Joint Spatial/Local Area Plans. Joint Local Area Plans will be prepared for the following settlements: • Key Town of Graiguecullen: A Joint Local Area Plan is to be prepared in collaboration with Carlow County Council; and
- Chapter 14 Implementation and Monitoring 310 | P a g e • Self Sustaining Growth Town of Portarlington: A Joint Local Area Plan is to beprepared in collaboration with Offaly County Council; and Local Area Plans will be prepared for the following settlements: • Key Town of Portlaoise • Self Sustaining Town of Mountmellick 14.4 DEVELOPMENT CONTRIBUTIONS Development contributions for the provision of services such as roads, footpaths and amenity / open space provision, etc will be applied where appropriate to development applications. The details and basis for the determination of the contributions are set out in a Development Contribution Scheme 2017-2023 or any subsequent schemes adopted thereafter in accordance with the provision of section 48 of the Planning and Development Act 2000 (as amended). 14.5 URDF AND RRDF One of the key objectives of the NPF relates to the need for compact growth, with development being focused within and close to existing built-up areas. A core element of this approach is the regeneration of infill and brownfield sites. This is in line with the NPF targets of achieving at least 50% of all new homes within or contiguous to the built-up area of Dublin city and suburbs and a target of at least 30% for other urban areas. In this regard, it is a policy objective of Laois County Council to promote measures to reduce vacancy and the underuse of existing building stock and support initiatives that promote the reuse, refurbishment and retrofitting of existing buildings within urban centres. 30% of lands zoned for residential purposes as part of this Plan have been identified for brownfield development. These lands are primarily located in the larger urban areas such as Portlaoise, Portarlington, Mountmellick and Graiguecullen where the greatest potential exists. The importance of the role of regeneration in the delivery of Project Ireland 2040 is acknowledged by the provision of the Urban Regeneration and Development Fund (URDF) and the Rural Regeneration and Development Fund (RRDF). The €2 Billion ten-year Urban Regeneration and Development Fund (URDF) was launched in 2018 to support compact sustainable development, through the regeneration of Ireland’s cities and large towns, in line with the objectives of Project Ireland 2040 – The National Planning Framework (NPF) and the National Development Plan (NDP) 2018 -2027. The Regional Spatial and Economic Strategy (RSES) provides the investment framework for Eastern and Midland Region. The types of proposals eligible for funding include strategic development areas, active land management, measures to address building vacancy and refurbishment, public realm improvements, enabling infrastructure, sustainable mobility and transition to low carbon and climate resilience. 14.5.1 REGENERATION DEMONSTRATION PROJECT - PORTLAOISE The aim of this project is to focus on regenerating the original town centre and main street areas and how they relate to the expanded town, with a view to creating more attractive, desirable places that people want to live and spend time in. The Demonstration Project will be initiated on a community and locally led urban design and renewal initiative. The national Regeneration and Development Agency, with investment from the Urban Regeneration and Development Fund and wider community and local businesses, will create and deliver a new vision for the centre of Portlaoise, to show how the best quality planning, urban design and implementation can createa rejuvenated town. There will be a particular focus on self-sustaining and community-driver renewal.
- Chapter 14 Implementation and Monitoring 311 | P a g e 14.5.2 RURAL REGENERATION AND DEVELOPMENT FUND (RRDF). The Rural Regeneration and Development Fund is a commitment of €1 billion by government to be invested in rural Ireland over the period 2019 to 2027. The purpose of the fund is to support job creation in rural areas, address de-population of rural communities and support improvements in our towns and villages with a population of less than 10,000, and outlying areas. It will be a key instrument to support the objectives of the NPF and to aid in the implementation of the RSES and the Laois County Development Plan 2021-2027. 14.6 BONDS Depending on the nature of the development, the Council may require, as a condition ofplanning permission, the lodgment of financial security to ensure that the permitted development is satisfactorily completed. The amount of the security will be determined by the Council and will be reviewed during the plan period. The security will be held by the Council until all works are satisfactorily completedto the exacting standards of the Council, or until the development is taken in charge by the Council 14.7 PHASING The timely provision of supporting infrastructure and community facilities in tandem with the development of areas is important in ensuring high quality, sustainable development takes place. All large-scale development proposals shall be phased having regard to the delivery of both physical and social infrastructure and orderly development. 14.8 MONITORING AND IMPLEMENTATION The Planning Department of the Council is the lead section responsible for monitoring and implementing the Plan, mainly through its development management function. However, it is important to note that this Plan co-ordinates the work and objectives of not only of the Planning, Infrastructure and Economic Development directorates but also the Corporate and Emergency Services, Operations, Housing, as well as the Finance and Water Service directorates. In some instances, the implementation of certain policy objectives may be the responsibility of external bodies such as OPW, Irish Water, National Parks & Wildlife Service, Fisheries Ireland, National Roads Authority, Transport Infrastructure Ireland, and the Environmental Protection Agency etc. The Planning Authority will work in collaboration with the relevant external body to assist in ensuring the implementation of the relevant policy objective. The t Plan policy objectives are specific, measurable, achievable and realistic. However, a number are set within a longer timeframe, thus they may not be fully implemented over the lifetime of this Plan. 14.8.1 IMPLEMENTATION AND MONTORING OF THE CORE STRATEGY The NPF states that new statutory guidelines, supported by wider methodologies and data sources, will be put in place under Section 28 of the Planning and Development Act to improve the evidence base, effectiveness and consistency of the planning process for housing provision at regional, metropolitan and local authority levels. This will be supported by the provision of standardised requirements by regulation for the recording of planning and housing data by the local authorities in order to provide a consistent and robust evidence base for housing policy formulation.
- Chapter 14 Implementation and Monitoring 312 | P a g e The mode share targets set for County Laois are focused on internal work and college trips. In terms of sustainable modes, "A New Transport Policy for Ireland 2009-2020" set out key National modal share targets for achievement by 2020. These targets were aimed at reducing work-related commuting by car as a modal share from 73% to 45% and accommodating car drivers on other modes of transport such as walking, cycling, public transport and car sharing. Although these targets have not been achieved, County Laois would aim to achieve this modal shift by 2040 and are putting in place many initiatives to deliver on this which are supported in policy objectives throughout the plan. The figures will be adjusted in accordance with Government policy and updated once a new census has been carried out in 2022. The development of multi-modal options has been based on these mode share targets. Table 14.1 - Modal share targets for Co Laois 2040 Modal share Targets for County Laois 2040 Mode Share Walk cycle Public Transport Car 2016 6% 1% 4% 73% 2040 20% 15% 20% 45% As such, Laois County Council, as set out in section 2.18, will monitor ongoing developments in this respect and review the operation and implementation of this Plan. This includes adjustments as needed to ensure the effectiveness of its alignment with National and Regional policy and objectives. Implementation and Monitoring Policy Objective IM 1 Monitor development for compliance with the objectives of the Core Strategy and adjust, where necessary, the approach taken to the consideration of development proposals in order to ensure effective alignment with National and Regional policy and objectives. IM2 Support the ongoing monitoring and review of the Housing Need Demand Assessment (HNDA) and monitor and maintain a record of residential development permitted in the open countryside, in accordance with forthcoming Departmental guidance for the establishment of a Housing Need Demand Assessment Coordination and Monitoring Unit and related implementation of a centralised spatial database for local authority housing. 14.9 STRATEGIC ENVIRONMENTAL ASSESSMENT The SEA Directive requires that the significant environmental effects of the implementation of plans and programmes are monitored. Monitoring can both demonstrate the positive effects facilitated by the Plan and can enable, at an early stage, the identification of unforeseenadverse effects and the undertaking of appropriate remedial action. The occurrence of significant adverse environmental effects not predicted and mitigated by this assessment, which are directly attributable to the implementation of the Plan, would necessitate consideration of these effects in the context of the Plan and potential remediation action(s) and/or review of part(s) of the Plan.
- Chapter 14 Implementation and Monitoring 313 | P a g e 14.9.1 INDICATORS AND TARGETS Monitoring is based around indicators which allow quantitative measures of trends and progress over time relating to the Strategic Environmental Objectives identified in Section 5 of the SEA Environmental Report and used in the evaluation. Each indicator to be monitored is accompanied by the target(s) which were identified with regard to the relevant strategic actions. Given the position of the Development Plan in the land use planning hierarchy beneath the Eastern and Midland Regional Spatial and Economic Strategy (RSES), the measures identified in that RSES SEA have been used – as they are or having been slightly modified – in most instances. This consistency across the hierarchy of land use plans will improve the efficiency and effectiveness of future monitoring programmes. Table 10.1 of the SEA Environmental Report shows the indicators and targets which have been selected for monitoring the likely significant environmental effects of implementing the Plan, if unmitigated. Monitoring is an ongoing process and the programme allows for flexibility and the further refinement of indicators and targets. The Monitoring Programme may be updated to deal with specific environmental issues – including unforeseen effects – as they arise. Many of the indicators relate to more than one of the freshwater and terrestrial environments. 14.9.2 SOURCES The Plan will form part of the wider land use planning framework comprising a hierarchy of policies, plans, programmes, etc. This wider framework, including the National Planning Framework and the Eastern and Midland RSES, is subject to its own SEA (and associated monitoring) requirements. At lower tiers of the hierarchy, Local Area Plans and individualprojects will be subject to their own monitoring requirements as relevant. In implementing the Monitoring Programme, the Council will take into account this hierarchy of planning and environmental monitoring. Sources for indicators may include existing monitoring databases (including those maintained by planning authorities and national/regional government departments and agencies) and the output of lower-tier environmental assessment and decision making (including a review of project approvals granted and associated documents and the output of any EIA monitoring programmes). Internal monitoring of the environmental effects of grants of permission in the Council would provide monitoring of certain indicators on a grant of permission basis. Where significantadverse as the result of a development to be permitted are identified, such effects could be identified, recorded and used to inform monitoring evaluation. 14.9.3 IMPLEMENTATION AND MONTORING OF THE CORE STRATEGY The Council shall, in conjunction with the Regional Assembly and other sources as relevant, implement the monitoring programme as set out in the SEA Environmental Report and Statement. This will include the preparation of stand-alone SEA Monitoring Reports: 1. To accompany the report required of the manager under Section 15(2) of the Act, including information in relation to progress on, and the results of, monitoring the significant environmental effects of implementation of the Plan, as required by Article13J(2) of the Planning and Development Regulations 2001 (as amended); On the significant environmental effects of implementing the Plan, in advance of the beginning of the review of the next Plan
- Chapter 14 Implementation and Monitoring 314 | P a g e Implementation and Monitoring Policy Objective IM 3 Prepare a stand-alone SEA Monitoring Report on the significant environmental effects of implementing the Plan in advance of the beginning of the review of the next Plan.
- 315 | P a g e GLOSSARY ACA Architectural Conservation Area CAFE Cleaner air for Europe Directive CEDRA Commission for the Economic Development of Rural Areas CEMPs Construction and Environmental Management Plans CIP Capital Investment Programme COA Certificate of Authorisation COMAH Control of Major Accident Hazards COR Certificate of Registration CRU Commission for Regulation of Utilities DAP Drainage Area Plan DHPLG Department of Housing, Planning and Local Government DMA District Meter Area DMURS Design Manual for Urban Roads and Streets, DTTS Department of Transport DECLG Department of Environment Community and Local Government EPA Environmental Protection Authority EVs Electric Vehicles GWS Group Water Schemes HSE Health Service Executive IFA Irish Farmers Association IWSTVGP Irish Water Small Towns and Villages Growth Programme LAWPRO Local Authority Waters Programme, LCDC Local Community and Development Committee LEO Local Enterprise Office LECP Local Economic and Community Plan NCAP National Certificate of Authorisation Programme NEEAP National Energy Efficiency Action Plan NFGWS National Federation of Group Water schemes NPF National Planning Framework NTA National Transport Authority PWS Public Water Supply RBMP River Basin Management Plan RMCEI Recommended Minimum Criteria for Environmental Inspections RPS Record of Protected Structures RSES Regional Spatial and Economic Strategy SAC Special Area of Conservation SLA Service Level Agreements SPS Small Private Supplies TEN-T Trans-European Networks TTA Traffic and Transport Assessment TTI Transport Infrastructure Ireland WFD Water Framework Directive WFP Waste Facility Permit WHO World Health Organisation WWSP Water Services Strategic Plan WWTW Wastewater Treatment Work
Source Laois County Council: Laois County Development Plan 2021–2027 (2021–2027) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.