Development plan · Dún Laoghaire-Rathdown County Council
Dún Laoghaire-Rathdown County Development Plan 2022–2028 – Written Statement
The council's development plan written statement: its strategy, policies, objectives and development standards. Variations adopted since are not in this text.
Ask this document
Answers come only from the text of Dún Laoghaire-Rathdown County Development Plan 2022–2028 – Written Statement, each claim linked to its page. They are not advice; check the page itself.
- Map 10 Laughanstown/Shankill SLO No: It is an Objective of the Council: 10 To retain, improve and encourage the provision of sustainable neighbourhood infrastructure facilities. 18 To promote the development of the Sutton to Sandycove Promenade and Cycleway as a component part of the National East Coast Trail Cycle Route and also the Dublin Bay trail from the boundary with Dublin City up to the boundary with Co. Wicklow. Any development proposal will protect and enhance public access to the coast where feasible. Any development proposals shall be subject to Appropriate Assessment Screening in accordance with the requirements of the EU Habitats Directive to ensure the protection and preservation of all designated SACs, SPAs, and pNHA(s) in Dublin Bay and the surrounding area. 67 To upgrade and improve Kilbogget Park in accordance with the future approved Masterplan. 68 To create a linear park along the Loughlinstown river incorporating a pedestrian route and cycleway (greenway), which will link Cabinteely Park to the sea at Rathsallagh. 69 To implement and develop the lands at Cherrywood in accordance with the adopted Strategic Development Zone Planning Scheme (SDZ), (as amended). 86 To prepare a Local Area Plan for Rathmichael. 88 To liaise with Transport Infrastructure Ireland (TII) to investigate potential improvements to the Loughlinstown Roundabout with any such improvements to be informed by the outcome of the TII`s on-going Corridor Studies. 89 To retain the famine grave on the site adjacent to St. Columcille’s Hospital. 90 To conserve the Bride’s Glen as a public amenity. 91 To accord with the policies of the Woodbrook/Shanganagh Local Area Plan. 92 That no insensitive or large-scale development will take place above the 90 - metre contour line at Rathmichael, from Old Connaught Golf Course to Pucks Castle Lane (Maps 10-14). 94 To improve pedestrian/cycle connectivity between Kilbogget Park and Loughlinstown Linear Park and thus improve local community connectivity. 95 To develop and support sustainable neighbourhoods into the future through the delivery of social and community infrastructure such as schools, amenities, and childcare facilities, etc. in accordance with the adopted Woodbrook/Shanganagh Local Area Plan. 117 The feasibility of incorporating the East Coast Cycle Trail into any coastal protection works required between Corbawn Lane and the proposed DART station at Woodbrook should be investigated. Such works shall be carried out in accordance with the recommendations of the Coastal Defence Strategy (2010) or any future Strategy. Any proposals shall be subject to Appropriate Assessment Screening in accordance with the requirements of the EU Habitats Directive and shall ensure the protection and preservation of all designated SACs, SPAs, and pNHA(s) in Dublin Bay and the surrounding area. 130 To ensure that development within this objective area does not (i)have a significant negative impact on the environmental sensitivities in the area including those identified in the SEA Environmental Report, and/or (ii) does not significantly detract from the character of the area either visually or by generating traffic volumes which would necessitate road widening or other significant improvements. 146 To support the retention of the existing medical/hospital uses at St Columcille's Hospital, Loughlinstown and facilitate its future development including the provision of supporting facilities. 147 To protect and enhance the public realm in Ballybrack Village. 148 To protect and safeguard the roundabouts on the approaches into Shankill village at St. Anne's Church and at the junction of Dublin Road (R119) and Quinn's Road. 149 To establish a new pedestrian walkway that retains the established permeability from the N11 through the lands at St Laurence to the Wyattville Park estate in Loughlinstown. A walkway shall be retained until this specific new SLO is achieved. 150 To allow for the provision of a new pedestrian and cycle link via a new combined foot and cycleway bridge from Rathmichael Road towards the Luas station at Cherrywood Business Park passing under the existing M50 motorway bridge and crossing the R116 Brides Glen road and valley. 333Specific Local ObjectivesChapter 14
- Map 12 Glencullen/Boranaraltry SLO No: It is an Objective of the Council: 22 To retain, improve and encourage the provision of sustainable neighbourhood infrastructure facilities within the outlined group of buildings / land. 76 To protect and conserve the Wicklow Mountains National Park Special Area of Conservation. 97 To prepare a Local Area Plan for Glencullen. 151 To provide for a number of holiday caravan/camping facilities within a 1km radius of the cross roads at Glencullen subject to the following: ensuring that there is not an over proliferation of such facilities, ensuring any proposals do not undermine the overall zoning objective, ensuring proposals do not have a negative impact on the source protection area or sensitive watercourses as identified in the Glencullen Local Area Plan and/or in section 10.2.2.5 of this Plan and ensuring that the development (including any resultant increases in visitor numbers and/or behaviour) does not affect the integrity of the Knocksink Wood Special Area of Conservation. Each facility shall be limited to a total of 10 pitches (combination of pods, glamping, tents, camper vans) and any glamping pods shall be commensurate in size and scale to a tent/camper van so as to avoid any negative visual impact on the landscape. Map 13 Glencullen/Ballycorus SLO No: It is an Objective of the Council: 22 To retain, improve and encourage the provision of sustainable neighbourhood infrastructure facilities within the outlined group of buildings / land. 80 To accord with the policies of the adopted Kiltiernan/Glenamuck Local Area Plan. 83 To protect the mosaic of habitats of the calcareous wetland and orchid grassland at Kingston/ Ballycorus, Kiltiernan. 97 To prepare a Local Area Plan for Glencullen. 99 To protect and conserve the Knocksink Wood Special Area of Conservation. 100 To investigate and consider the feasibility of designing and implementing a Management Plan for Carrickgollogan Hill area, to the north of Murphy’s Lane and including the Lead Mine complex. 101 To protect and conserve Ballyman Glen Special Area of Conservation. 102 The Council will assist the Dublin Mountain Partnership to facilitate enhancements to the public Right- of-way between Scalp Villa, Enniskerry Road and Ballybetagh Road, as part of the Dublin Mountains Way. 151 To provide for a number of holiday caravan/camping facilities within a 1km radius of the cross roads at Glencullen subject to the following: ensuring that there is not an over proliferation of such facilities, ensuring any proposals do not undermine the overall zoning objective, ensuring proposals do not have a negative impact on the source protection area or sensitive watercourses as identified in the Glencullen Local Area Plan and/or in section 10.2.2.5 of this Plan and ensuring that the development (including any resultant increases in visitor numbers and/or behaviour) does not affect the integrity of the Knocksink Wood Special Area of Conservation. Each facility shall be limited to a total of 10 pitches (combination of pods, glamping, tents, camper vans) and any glamping pods shall be commensurate in size and scale to a tent/camper van so as to avoid any negative visual impact on the landscape. Map 11 and Insets Glendoo/Boranaraltry SLO No: It is an Objective of the Council: 76 To protect and conserve the Wicklow Mountains National Park Special Area of Conservation. 96 Through the Council’s membership of the Dublin Mountains Partnership (DMP), to improve the recreation potential of the public lands in the Dublin Mountains. 334dlrcoco | County Development Plan 2022-2028
- Map 14 Rathmichael/Old Connaught SLO No: It is an Objective of the Council: 18 To promote the development of the Sutton to Sandycove Promenade and Cycleway as a component part of the National East Coast Trail Cycle Route and also the Dublin Bay trail from the boundary with Dublin City up to the boundary with Co. Wicklow. Any development proposal will protect and enhance public access to the coast where feasible. Any development proposals shall be subject to Appropriate Assessment Screening in accordance with the requirements of the EU Habitats Directive to ensure the protection and preservation of all designated SACs, SPAs, and pNHA(s) in Dublin Bay and the surrounding area. 22 To retain, improve and encourage the provision of sustainable neighbourhood infrastructure facilities within the outlined group of buildings / land. 92 That no insensitive or large-scale development will take place above the 90-metre contour line at Rathmichael, from Old Connaught Golf Course to Pucks Castle Lane – Maps 10-14. 98 To provide for the remediation of the Bray landfill site. 100 To investigate and consider the feasibility of designing and implementing a Management Plan for Carrickgollogan Hill area, to the north of Murphy’s Lane and including the Lead Mine complex. 101 To protect and conserve Ballyman Glen Special Area of Conservation. 103 To accord with the policies of the adopted Woodbrook/ Shanganagh Local Area Plan. 104 To investigate the potential upgrading of the Wilford Interchange to provide connectivity to lands west of the M11 and Old Connaught Village with any such improvements to be informed by the outcome of the TII`s on-going Corridor Studies. 105 To prepare a Local Area Plan for Old Connaught. 106 To support the development of a crematorium at Shanganagh Cemetery. 107 To co-operate with the National Transport Authority, Transport Infrastructure Ireland and Wicklow County Council in the establishment of a busway and bridge from Fassaroe to Old Connaught over County Brook at Ballyman Glen which facilitates walking and cycling to provide connections between the proposed new development areas of old Connaught and Fassaroe (Wicklow County). 108 To provide pedestrian/cycle access across the M11 corridor in the vicinity of Allies River Road, the corridor and route selection process outlined in Policy Objective T24 should be followed. 109 To continue the development of Shanganagh Park in accordance with the Masterplan, and to develop a sports facility and improved recreational facilities in the park. 110 To upgrade and enhance the linear park at Woodbrook Glen/Corke Abbey. 111 To provide a DART Station at Woodbrook. 112 To facilitate the provision of a pedestrian and cycle corridor connecting Cois Cairn to the Dublin Road, in conjunction with the development of the Council owned `E` zoned lands and the upgrading of the Wilford Interchange, with any such improvements to be informed by the outcome of the TII’s on-going Corridor Studies and any future studies. 119 To provide a permeability link between the Green Area/Linear Park between Corke Abbey and Woodbrook Glen, and any development on the Former Bray Golf Club lands to allow access towards Bray Harbour. 335Specific Local ObjectivesChapter 14
- 336dlrcoco | County Development Plan 2022-2028
- Implementation, Monitoring and Evaluation 5 Cherrywood (Credit: Hines)
- Rosemount Housing Development 338dlrcoco | County Development Plan 2022-2028 | Plan
- 15.1 Introduction The implementation and delivery of the County Development Plan is a key objective of the Planning Authority. The establishment of a performance management system is important to better understand whether, and to what extent, the Policy Objectives of the County Development Plan are being realised. The DLR County Development Plan introduces, for the first time, a more formalised approach to Plan implementation, monitoring and evaluation, which provides a framework for measuring the outcomes of the Policy Objectives of the Plan. The framework seeks to move beyond assessment of the planning system from a primarily procedural and administrative perspective (no. of planning applications / units permitted etc.) to a richer form of planning performance which incorporates planning outcome monitoring and evaluation across a broad range of policies. It is acknowledged that Policy Objectives often take a number of Plan cycles to be fully realised and as such the framework provides a first step towards assessing the value and quality of planning outcomes which will continue though successive County Development Plans. 15.2 Implementation and Monitoring The implementation and monitoring framework for the Plan is set out in Section 15.5 below. The framework is anchored to the Vision for the County Development Plan (see Section 1.7) and the Strategic County Outcomes which underpin its delivery (see Figure 15.1). The County Development Plan Vision and Strategic County Outcomes are themselves broadly aligned with the Regional Strategic Outcomes of the RSES, the National Strategic Outcomes of the NPF, and the United Nations Sustainable Development Goals. Figure 15.1: County Development Plan - Strategic County Outcomes Creation of a climate resilient County Creation of a compact and connected County Creation of a vibrant economic County Creation of an inclusive and healthy County Creation of a Network of Liveable Towns and Villages 339Implementation, Monitoring and EvaluationChapter 15
- The implementation and monitoring framework categorises key Policy Objectives in terms of their contribution towards the achievement of the Strategic County Outcomes. Many of the Policy Objectives are multi-faceted and as such contribute to the achievement of multiple Strategic County Outcomes, which themselves are interrelated. Policy Objectives are assessed in terms of means of implementation and also key performance indicators to monitor/ evaluate the delivery of the Policy Objective. It is noted that the intention of Policy Objectives are wide-ranging and as such the implementation and monitoring framework does not comprise a comprehensive list of all policies. While every effort has been made to formulate Policy Objectives in the Plan that are SMART (Specific, Measurable, Assignable, Realistic and Time-Related) it is acknowledged that not all Policy Objectives may be measured in easily identifiable quantitative values. Many Policy Objectives relate to development management processes which may be implemented through established internal processes and procedures. Other Policy Objectives may relate to criteria which are considered as part of multifaceted decision-making processes which require the balancing of a range of Policy Objectives against particular site-specific circumstances. In addition, it is noted that many Policy Objectives are intended to facilitate and support an intended outcome, rather than act as a direct means of delivering the outcome. In this regard, implementation of the Policy Objectives of the County Development Plan, and the delivery of desired planning outcomes, may be subject to a range of external factors, most notably wider economic circumstances and availability of resources. Notwithstanding these limitations, the implementation and monitoring framework seeks to align, where possible, the right indicators that appropriately reflect and measure whether a Policy Objective is being achieved. The Key Performance Indicators set out in the implementation and monitoring framework in Section 15.5 are not intended to comprise an exhaustive list and additional data / information – both quantitative and qualitative - may be incorporated for analysis purposes, as appropriate. 15.3 Plan Evaluation and Reporting The implementation and monitoring framework is intended to function as a formal feedback loop with the evaluation and reporting processes intended to comprise a key input into the formulation and refinement of future planning policy. In this manner, the framework is intended to serve as an important evidence-based input and integrate with the review process of subsequent County Development Plans. In terms of its formal evaluation role, the framework is intended to assist the Planning Authority in meeting its statutory reporting requirements including: M The 2 Year Progress Report of the County Development Plan (as required under Section 15(2) of The Act). M Report to the Regional Assembly setting out progress made in supporting objectives of the RSES (as required under Section 25A(1) of The Act). 15.4 Environmental Monitoring Article 10 of the SEA Directive requires monitoring of the significant environmental effects of the implementation of the County Development Plan in order to identify, at an early stage, unforeseen adverse effects and to enable appropriate remedial action to be undertaken. While the monitoring framework set out below incorporates some monitoring of environment related objectives, the full and comprehensive monitoring and evaluation assessment, required to be undertaken under Article 10 of the SEA Directive, is set out in the Strategic Environmental Assessment that accompanies the County Development Plan. IME1: SEA Monitoring It is a Policy Objective to monitor the significant environmental effects of the implementation of the County Development Plan through the monitoring measures and reporting requirements set out in Section 10 of the SEA Environmental Report for the County Development Plan. 340dlrcoco | County Development Plan 2022-2028 | Plan
- 15.5 Implementation and Monitoring Framework 15.5.1 Introduction, Vision and Context Policy Objective Strategic County Outcomes Implementation Monitoring and Evaluation (Key Performance Indicator / Data Source) Climate Resilience Compact and Connected Liveable County Inclusive and Healthy Vibrant Economy RSES1- Regional Spatial and Economic Strategy 3 3 3 3 3 Consistency with the RSES Regional Policy Objectives. Prepare a Report setting out progress made in supporting the objectives of the RSES - in accordance with Section 25A(1) of The Act. Data sources: Various. MASP1- Dublin Metropolitan Area Strategic Plan 3 3 3 3 3 Consistency with the Dublin MASP. Prepare a Report setting out progress made in supporting the objectives of the Dublin MASP - in accordance with Section 25A(1) of The Act. Data sources: Various. 15.5.2 Core Strategy Policy Objective Strategic County Outcomes Implementation Monitoring and Evaluation (Key Performance Indicator / Data Source) Climate Resilience Compact and Connected Liveable County Inclusive and Healthy Vibrant Economy CS1 – Housing Need Demand Assessment 3 3 Review the HNDA 2022-2028. Review the DLR HNDA 2022-2028 subsequent to the preparation of a Regional HNDA. CS2 – Core Strategy 3 3 3 3 3 Development management. New dwelling completions. Data source: CSO. CS3 – Supply of Zoned Land 3 3 3 N/A New dwelling completions. Data source: CSO. CS5 – Strategic Land Reserve 3 3 Development management and LAP plan-making. Assessment through development management functions and LAP provisions. CS6 – Lands for Employment Use 3 3 3 Spatial analysis. Land availability study of employment zoned lands. Data source: Various. CS7 – Strategic Employment Locations 3 3 3 Development management. Quantum of employment development in strategic employment locations. Data source: Planning data (APAS). CS8 – Ecosystem Services Approach 3 3 Plan-making. Application and specific recognition in LAPs identified as part of the LAP plan-making programme. 341Implementation, Monitoring and EvaluationChapter 15
- Policy Objective Strategic County Outcomes Implementation Monitoring and Evaluation (Key Performance Indicator / Data Source) Climate Resilience Compact and Connected Liveable County Inclusive and Healthy Vibrant Economy CS9 - Strategic Development Zone 3 3 Development management. Progress with regards the implementation of the SDZ Scheme. CS10 – Local Area Plans 3 3 3 3 3 LAP preparation. Preparation of an annual report setting out progress of the LAP programme. CS11 – Compact Growth 3 3 3 3 3 Development management. Percentage of residential development within or contiguous to Dublin City and Suburbs. Data source: GeoDirectory. CS12 - Brownfield and Infill Sites 3 3 3 Undertake an audit of potential strategic brownfield and infill sites in DLR. Establish a database of strategic brownfield and infill sites. Data sources: Various. CS13 – Strategic Regeneration 3 3 3 Development management. Development at identified strategic regeneration sites. Data source: Planning data (APAS). CS14 - Vacancy and Regeneration 3 3 3 Development management. Vacancy rates of existing properties. Data source: GeoDirectory. CS15 - Vacant Site Levy 3 3 3 Implementation of the provisions of the Urban Regeneration and Housing Act 2015. Number of sites added to the Vacant Sites Register / Number of sites removed from the Register and brought forward for development. Data source: DLR Vacant Sites Register. CS17 – Monitoring and Evaluation 3 3 3 3 3 Plan monitoring and evaluation. Prepare a 2 Year Progress Report of the County Development Plan. Prepare a Report on achieving the objectives of the RSES. Data sources: Various. 342dlrcoco | County Development Plan 2022-2028 | Plan
Source Dún Laoghaire-Rathdown County Council: Dún Laoghaire-Rathdown County Development Plan 2022–2028 – Written Statement (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.