Refusals and conditions

From the council's decision notices

Westmeath: why applications are refused, and the conditions permissions carry

Counted from Westmeath’s own decision notices: 489 of its 512 decisions made from 24 November 2025 to 24 November 2026 (96%). Findings, not verdicts — each figure is a share of the notices read.

Decision notices read
489
of 512 decisions, last 12 months
Refusals read
75
of 80 refused or part refused
Permissions read
408
of 432 granted or part granted
Conditions on a permission
7
the median permission read

Why applications are refused

Grounds cited in refusals

Share of 75 refusals whose decision notice we read

  1. Contrary to development plan policy84%
  2. Design, scale and visual impact57%
  3. Landscape, scenic views and routes35%
  4. Insufficient information33%
  5. Traffic safety, access and sightlines29%
  6. Undesirable precedent28%
  7. Rural housing policy and local need25%
  8. Ecology, Natura 2000 and appropriate assessment24%
  9. Neighbours' amenity (overlooking, overshadowing, overbearing)20%
  10. Density, layout and residential standards17%
  11. Environmental effects (noise, emissions, EIA)17%
  12. Protected structures, ACAs and archaeology17%

A notice counts once for each theme it cites, however often it cites it — the share of refusals refused at least partly on that ground. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 17 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Contrary to development plan policy6384%
Design, scale and visual impact4357%
Landscape, scenic views and routes2635%
Insufficient information2533%
Traffic safety, access and sightlines2229%
Undesirable precedent2128%
Rural housing policy and local need1925%
Ecology, Natura 2000 and appropriate assessment1824%
Neighbours' amenity (overlooking, overshadowing, overbearing)1520%
Density, layout and residential standards1317%
Environmental effects (noise, emissions, EIA)1317%
Protected structures, ACAs and archaeology1317%
Zoning and land use1115%
On-site wastewater and public health68%
Other68%
Water supply and public sewer capacity57%
Flood risk45%

The conditions permissions carry

Kinds of condition attached

Share of 408 permissions whose decision notice we read

  1. Built as per the plans and particulars100%
  2. Surface water and drainage (SuDS)80%
  3. Materials, finishes and design changes75%
  4. Development contributions and security bonds72%
  5. Entrance, sightlines, roads and parking72%
  6. Restrictions on use or further development65%
  7. Protecting neighbours (screening, glazing, noise, light)63%
  8. On-site wastewater treatment system53%
  9. Landscaping, hedgerows, trees and boundaries50%
  10. Uisce Éireann water and sewer connections39%
  11. Ecology (bats, nesting birds, AA mitigation)36%
  12. Occupancy and local-need conditions36%

A notice counts once for each theme it cites, however often it cites it — the share of permissions given at least one condition of that kind. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 20 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Built as per the plans and particulars406100%
Surface water and drainage (SuDS)32880%
Materials, finishes and design changes30775%
Development contributions and security bonds29372%
Entrance, sightlines, roads and parking29272%
Restrictions on use or further development26565%
Protecting neighbours (screening, glazing, noise, light)25763%
On-site wastewater treatment system21853%
Landscaping, hedgerows, trees and boundaries20250%
Uisce Éireann water and sewer connections16139%
Ecology (bats, nesting birds, AA mitigation)14736%
Occupancy and local-need conditions14536%
Construction hours and management13433%
Other11729%
Waste management9122%
Archaeology and built heritage4411%
Duration or temporary permission359%
Energy, EV charging and climate297%
Estate completion, lighting, naming and taking in charge236%
Part V social housing205%

By type of development

The grounds cited in refusals and the conditions attached in Westmeath, by type of development
TypeNotices readRefusals: most citedPermissions: most common conditions
Agricultural4095% of decisions4 read — too few
  1. Surface water and drainage (SuDS)94%
  2. Waste management83%
  3. Development contributions and security bonds72%
Extension10596% of decisions12 read — too few
  1. Materials, finishes and design changes85%
  2. Surface water and drainage (SuDS)82%
  3. Restrictions on use or further development75%
New dwelling14396% of decisions
  1. Contrary to development plan policy88%
  2. Design, scale and visual impact63%
  3. Landscape, scenic views and routes59%
  1. Surface water and drainage (SuDS)98%
  2. Development contributions and security bonds96%
  3. Entrance, sightlines, roads and parking96%
Retention6793% of decisions11 read — too few
  1. Development contributions and security bonds79%
  2. Restrictions on use or further development77%
  3. Surface water and drainage (SuDS)66%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

By town

Towns with at least 30 refusals or permissions read, listed alphabetically.

The grounds cited in refusals and the conditions attached in Westmeath's towns, listed alphabetically
TownNotices readRefusals: most citedPermissions: most common conditions
Athlone5098% of decisions7 read — too few
  1. Materials, finishes and design changes79%
  2. Protecting neighbours (screening, glazing, noise, light)69%
  3. Restrictions on use or further development67%
Mullingar5793% of decisions8 read — too few
  1. Materials, finishes and design changes80%
  2. Protecting neighbours (screening, glazing, noise, light)65%
  3. Entrance, sightlines, roads and parking57%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

About the figures

PPI’s reader reads each decision notice, finds every refusal reason and condition in it word for word, and tags each with what it is about from a fixed list. A figure counts notices: a refusal citing flood risk in two of its reasons counts once for flood risk. Reasons and conditions the reader could not find word for word are not counted.

What a council refuses for, and the conditions it attaches, depend on what it was asked to decide as much as on the council. A group with fewer than 30 notices read shows its count and no breakdown. Every council read →

Source Westmeath's decision notices, read and counted by PPI; no notice text is reproduced hereAlways confirm a decision against the council’s own register.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions