Skip to content

Refusals and conditions

From the council's decision notices

Tipperary: why applications are refused, and the conditions permissions carry

Counted from Tipperary’s own decision notices: 1,016 of its 1,028 decisions made from 24 November 2025 to 24 November 2026 (99%). Findings, not verdicts — each figure is a share of the notices read.

Decision notices read
1,016
of 1,028 decisions, last 12 months
Refusals read
50
of 51 refused or part refused
Permissions read
948
of 977 granted or part granted
Conditions on a permission
5
the median permission read

Why applications are refused

Grounds cited in refusals

Share of 50 refusals whose decision notice we read

  1. Contrary to development plan policy78%
  2. Undesirable precedent46%
  3. Other28%
  4. Traffic safety, access and sightlines28%
  5. Zoning and land use28%
  6. Insufficient information22%
  7. Neighbours' amenity (overlooking, overshadowing, overbearing)22%
  8. Design, scale and visual impact14%
  9. Density, layout and residential standards10%
  10. Rural housing policy and local need10%
  11. Flood risk8%
  12. Protected structures, ACAs and archaeology8%

A notice counts once for each theme it cites, however often it cites it — the share of refusals refused at least partly on that ground. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 15 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Contrary to development plan policy3978%
Undesirable precedent2346%
Other1428%
Traffic safety, access and sightlines1428%
Zoning and land use1428%
Insufficient information1122%
Neighbours' amenity (overlooking, overshadowing, overbearing)1122%
Design, scale and visual impact714%
Density, layout and residential standards510%
Rural housing policy and local need510%
Flood risk48%
Protected structures, ACAs and archaeology48%
Ecology, Natura 2000 and appropriate assessment36%
On-site wastewater and public health36%
Ribbon development36%

The conditions permissions carry

Kinds of condition attached

Share of 948 permissions whose decision notice we read

  1. Built as per the plans and particulars100%
  2. Surface water and drainage (SuDS)91%
  3. Protecting neighbours (screening, glazing, noise, light)76%
  4. Entrance, sightlines, roads and parking72%
  5. Construction hours and management66%
  6. Materials, finishes and design changes65%
  7. Development contributions and security bonds57%
  8. Restrictions on use or further development51%
  9. On-site wastewater treatment system33%
  10. Landscaping, hedgerows, trees and boundaries31%
  11. Uisce Éireann water and sewer connections26%
  12. Waste management20%

A notice counts once for each theme it cites, however often it cites it — the share of permissions given at least one condition of that kind. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 20 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Built as per the plans and particulars947100%
Surface water and drainage (SuDS)86591%
Protecting neighbours (screening, glazing, noise, light)71776%
Entrance, sightlines, roads and parking68172%
Construction hours and management62566%
Materials, finishes and design changes62065%
Development contributions and security bonds53757%
Restrictions on use or further development48351%
On-site wastewater treatment system31233%
Landscaping, hedgerows, trees and boundaries29531%
Uisce Éireann water and sewer connections24526%
Waste management19220%
Occupancy and local-need conditions18319%
Other16818%
Duration or temporary permission707%
Archaeology and built heritage616%
Ecology (bats, nesting birds, AA mitigation)536%
Estate completion, lighting, naming and taking in charge273%
Energy, EV charging and climate182%
Part V social housing152%

By type of development

The grounds cited in refusals and the conditions attached in Tipperary, by type of development
TypeNotices readRefusals: most citedPermissions: most common conditions
Agricultural12299% of decisions2 read — too few
  1. Surface water and drainage (SuDS)99%
  2. Waste management93%
  3. Protecting neighbours (screening, glazing, noise, light)92%
Alterations69100% of decisions3 read — too few
  1. Surface water and drainage (SuDS)52%
  2. Protecting neighbours (screening, glazing, noise, light)48%
  3. Materials, finishes and design changes45%
Change of use61100% of decisions10 read — too few
  1. Protecting neighbours (screening, glazing, noise, light)80%
  2. Materials, finishes and design changes75%
  3. Restrictions on use or further development71%
Extension206100% of decisions4 read — too few
  1. Surface water and drainage (SuDS)99%
  2. Protecting neighbours (screening, glazing, noise, light)93%
  3. Construction hours and management86%
Infrastructure53100% of decisions1 read — too few
  1. Surface water and drainage (SuDS)83%
  2. Entrance, sightlines, roads and parking79%
  3. Protecting neighbours (screening, glazing, noise, light)79%
New dwelling17598% of decisions9 read — too few
  1. Development contributions and security bonds99%
  2. Materials, finishes and design changes99%
  3. Surface water and drainage (SuDS)99%
Retention22499% of decisions8 read — too few
  1. Surface water and drainage (SuDS)94%
  2. Entrance, sightlines, roads and parking73%
  3. Restrictions on use or further development60%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

By town

Towns with at least 30 refusals or permissions read, listed alphabetically.

The grounds cited in refusals and the conditions attached in Tipperary's towns, listed alphabetically
TownNotices readRefusals: most citedPermissions: most common conditions
Clonmel55100% of decisions1 read — too few
  1. Surface water and drainage (SuDS)75%
  2. Protecting neighbours (screening, glazing, noise, light)74%
  3. Entrance, sightlines, roads and parking72%
Nenagh4295% of decisions5 read — too few
  1. Surface water and drainage (SuDS)83%
  2. Protecting neighbours (screening, glazing, noise, light)81%
  3. Construction hours and management72%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

About the figures

PPI’s reader reads each decision notice, finds every refusal reason and condition in it word for word, and tags each with what it is about from a fixed list. A figure counts notices: a refusal citing flood risk in two of its reasons counts once for flood risk. Reasons and conditions the reader could not find word for word are not counted.

What a council refuses for, and the conditions it attaches, depend on what it was asked to decide as much as on the council. A group with fewer than 30 notices read shows its count and no breakdown. Every council read →

Source Tipperary's decision notices, read and counted by PPI; no notice text is reproduced hereAlways confirm a decision against the council’s own register.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions