Longford: why applications are refused, and the conditions permissions carry
Counted from Longford’s own decision notices: 261 of its 262 decisions made from 24 November 2025 to 24 November 2026 (100%). Findings, not verdicts — each figure is a share of the notices read.
- 261
- of 262 decisions, last 12 months
- 45
- of 45 refused or part refused
- 214
- of 217 granted or part granted
- 8
- the median permission read
Why applications are refused
Grounds cited in refusals
A notice counts once for each theme it cites, however often it cites it — the share of refusals refused at least partly on that ground. A notice can cite several, so the shares do not add up to 100%.
Show the numbers
| Theme | Notices | Share |
|---|---|---|
| Contrary to development plan policy | 39 | 87% |
| Traffic safety, access and sightlines | 18 | 40% |
| Insufficient information | 17 | 38% |
| Undesirable precedent | 15 | 33% |
| Rural housing policy and local need | 13 | 29% |
| Environmental effects (noise, emissions, EIA) | 12 | 27% |
| Design, scale and visual impact | 11 | 24% |
| On-site wastewater and public health | 11 | 24% |
| Neighbours' amenity (overlooking, overshadowing, overbearing) | 10 | 22% |
| Density, layout and residential standards | 5 | 11% |
| Landscape, scenic views and routes | 5 | 11% |
| Other | 3 | 7% |
The conditions permissions carry
Kinds of condition attached
A notice counts once for each theme it cites, however often it cites it — the share of permissions given at least one condition of that kind. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 19 are drawn; the table has them all.
Show the numbers
| Theme | Notices | Share |
|---|---|---|
| Built as per the plans and particulars | 214 | 100% |
| Entrance, sightlines, roads and parking | 178 | 83% |
| Materials, finishes and design changes | 171 | 80% |
| Construction hours and management | 170 | 79% |
| Surface water and drainage (SuDS) | 165 | 77% |
| Energy, EV charging and climate | 158 | 74% |
| Restrictions on use or further development | 144 | 67% |
| Waste management | 139 | 65% |
| Protecting neighbours (screening, glazing, noise, light) | 132 | 62% |
| On-site wastewater treatment system | 110 | 51% |
| Landscaping, hedgerows, trees and boundaries | 84 | 39% |
| Development contributions and security bonds | 76 | 36% |
| Ecology (bats, nesting birds, AA mitigation) | 71 | 33% |
| Other | 51 | 24% |
| Occupancy and local-need conditions | 45 | 21% |
| Uisce Éireann water and sewer connections | 31 | 14% |
| Archaeology and built heritage | 22 | 10% |
| Duration or temporary permission | 19 | 9% |
| Estate completion, lighting, naming and taking in charge | 3 | 1% |
By type of development
| Type | Notices read | Refusals: most cited | Permissions: most common conditions |
|---|---|---|---|
| Extension | 5598% of decisions | 4 read — too few |
|
| New dwelling | 60100% of decisions | 15 read — too few |
|
| Retention | 36100% of decisions | 6 read — too few |
|
Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.
About the figures
PPI’s reader reads each decision notice, finds every refusal reason and condition in it word for word, and tags each with what it is about from a fixed list. A figure counts notices: a refusal citing flood risk in two of its reasons counts once for flood risk. Reasons and conditions the reader could not find word for word are not counted.
What a council refuses for, and the conditions it attaches, depend on what it was asked to decide as much as on the council. A group with fewer than 30 notices read shows its count and no breakdown. Every council read →
Source Longford's decision notices, read and counted by PPI; no notice text is reproduced hereAlways confirm a decision against the council’s own register.