Leitrim: why applications are refused, and the conditions permissions carry

Counted from Leitrim’s own decision notices: 216 of its 219 decisions made from 24 November 2025 to 24 November 2026 (99%). Findings, not verdicts — each figure is a share of the notices read.

Decision notices read
216
of 219 decisions, last 12 months
Refusals read
11
of 12 refused or part refused
Permissions read
197
of 207 granted or part granted
Conditions on a permission
9
the median permission read

Why applications are refused

Grounds cited in refusals

11 refusals read — fewer than 30 decision notices read here, too few to break down.

The conditions permissions carry

Kinds of condition attached

Share of 197 permissions whose decision notice we read

  1. Built as per the plans and particulars100%
  2. Surface water and drainage (SuDS)92%
  3. Protecting neighbours (screening, glazing, noise, light)80%
  4. Entrance, sightlines, roads and parking76%
  5. Materials, finishes and design changes75%
  6. Waste management74%
  7. Construction hours and management70%
  8. Restrictions on use or further development69%
  9. Development contributions and security bonds59%
  10. On-site wastewater treatment system47%
  11. Landscaping, hedgerows, trees and boundaries44%
  12. Uisce Éireann water and sewer connections27%

A notice counts once for each theme it cites, however often it cites it — the share of permissions given at least one condition of that kind. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 20 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Built as per the plans and particulars197100%
Surface water and drainage (SuDS)18192%
Protecting neighbours (screening, glazing, noise, light)15780%
Entrance, sightlines, roads and parking15076%
Materials, finishes and design changes14875%
Waste management14574%
Construction hours and management13870%
Restrictions on use or further development13669%
Development contributions and security bonds11659%
On-site wastewater treatment system9247%
Landscaping, hedgerows, trees and boundaries8644%
Uisce Éireann water and sewer connections5327%
Other2714%
Archaeology and built heritage2111%
Occupancy and local-need conditions147%
Ecology (bats, nesting birds, AA mitigation)137%
Energy, EV charging and climate116%
Estate completion, lighting, naming and taking in charge105%
Duration or temporary permission84%
Part V social housing63%

By type of development

The grounds cited in refusals and the conditions attached in Leitrim, by type of development
TypeNotices readRefusals: most citedPermissions: most common conditions
Extension52100% of decisions1 read — too few
  1. Surface water and drainage (SuDS)100%
  2. Waste management96%
  3. Construction hours and management94%
New dwelling41100% of decisions1 read — too few
  1. Entrance, sightlines, roads and parking100%
  2. Materials, finishes and design changes100%
  3. Surface water and drainage (SuDS)100%
Retention4298% of decisions2 read — too few
  1. Surface water and drainage (SuDS)88%
  2. Entrance, sightlines, roads and parking68%
  3. Restrictions on use or further development68%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

About the figures

PPI’s reader reads each decision notice, finds every refusal reason and condition in it word for word, and tags each with what it is about from a fixed list. A figure counts notices: a refusal citing flood risk in two of its reasons counts once for flood risk. Reasons and conditions the reader could not find word for word are not counted.

What a council refuses for, and the conditions it attaches, depend on what it was asked to decide as much as on the council. A group with fewer than 30 notices read shows its count and no breakdown. Every council read →

Source Leitrim's decision notices, read and counted by PPI; no notice text is reproduced hereAlways confirm a decision against the council’s own register.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions