Counted from Cavan’s own decision notices: 544 of its 569 decisions made from 24 November 2025 to 24 November 2026 (96%). Findings, not verdicts — each figure is a share of the notices read.

Decision notices read
544
of 569 decisions, last 12 months
Refusals read
24
of 26 refused or part refused
Permissions read
520
of 543 granted or part granted
Conditions on a permission
11
the median permission read

Why applications are refused

Grounds cited in refusals

24 refusals read — fewer than 30 decision notices read here, too few to break down.

The conditions permissions carry

Kinds of condition attached

Share of 520 permissions whose decision notice we read

  1. Built as per the plans and particulars100%
  2. Surface water and drainage (SuDS)92%
  3. Entrance, sightlines, roads and parking84%
  4. Materials, finishes and design changes79%
  5. Construction hours and management77%
  6. Restrictions on use or further development71%
  7. Development contributions and security bonds70%
  8. Protecting neighbours (screening, glazing, noise, light)64%
  9. Waste management64%
  10. On-site wastewater treatment system51%
  11. Landscaping, hedgerows, trees and boundaries46%
  12. Ecology (bats, nesting birds, AA mitigation)42%

A notice counts once for each theme it cites, however often it cites it — the share of permissions given at least one condition of that kind. A notice can cite several, so the shares do not add up to 100%. The 12 most common of 20 are drawn; the table has them all.

Show the numbers
ThemeNoticesShare
Built as per the plans and particulars520100%
Surface water and drainage (SuDS)48092%
Entrance, sightlines, roads and parking43884%
Materials, finishes and design changes41279%
Construction hours and management39877%
Restrictions on use or further development36971%
Development contributions and security bonds36270%
Protecting neighbours (screening, glazing, noise, light)33264%
Waste management33164%
On-site wastewater treatment system26451%
Landscaping, hedgerows, trees and boundaries23946%
Ecology (bats, nesting birds, AA mitigation)21742%
Occupancy and local-need conditions15329%
Uisce Éireann water and sewer connections7915%
Other7114%
Archaeology and built heritage367%
Duration or temporary permission357%
Estate completion, lighting, naming and taking in charge285%
Part V social housing173%
Energy, EV charging and climate143%

By type of development

The grounds cited in refusals and the conditions attached in Cavan, by type of development
TypeNotices readRefusals: most citedPermissions: most common conditions
Agricultural5897% of decisions1 read — too few
  1. Surface water and drainage (SuDS)96%
  2. Construction hours and management95%
  3. Waste management91%
Extension10495% of decisions2 read — too few
  1. Materials, finishes and design changes98%
  2. Entrance, sightlines, roads and parking96%
  3. Surface water and drainage (SuDS)96%
New dwelling11496% of decisions15 read — too few
  1. Materials, finishes and design changes96%
  2. Surface water and drainage (SuDS)96%
  3. Development contributions and security bonds95%
Retention11195% of decisions3 read — too few
  1. Surface water and drainage (SuDS)88%
  2. Protecting neighbours (screening, glazing, noise, light)71%
  3. Entrance, sightlines, roads and parking68%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

By town

Towns with at least 30 refusals or permissions read, listed alphabetically.

The grounds cited in refusals and the conditions attached in Cavan's towns, listed alphabetically
TownNotices readRefusals: most citedPermissions: most common conditions
Cavan5196% of decisions3 read — too few
  1. Surface water and drainage (SuDS)88%
  2. Protecting neighbours (screening, glazing, noise, light)77%
  3. Entrance, sightlines, roads and parking67%

Shares are of the refusals or permissions whose notice was read. The conditions column leaves out “built as per the plans and particulars”, which nearly every permission carries. A group with fewer than 30 notices read shows its count and no breakdown.

About the figures

PPI’s reader reads each decision notice, finds every refusal reason and condition in it word for word, and tags each with what it is about from a fixed list. A figure counts notices: a refusal citing flood risk in two of its reasons counts once for flood risk. Reasons and conditions the reader could not find word for word are not counted.

What a council refuses for, and the conditions it attaches, depend on what it was asked to decide as much as on the council. A group with fewer than 30 notices read shows its count and no breakdown. Every council read →

Source Cavan's decision notices, read and counted by PPI; no notice text is reproduced hereAlways confirm a decision against the council’s own register.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions